Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1299

Return Actual Cost to Work Inspector/Progress webpage

I note the New/Enhanced Feature for SYNCHRO Perform removed "Actual Cost" from the Progress page of the Work Inspector in 9-Jun-2024 update. This page reports "Revised Earned Cost" which is linked to the actual progress. This information is most u...
Ernest Downes 5 months ago in Perform / Progress Measurement 0

Make Hierarchy tree and Inspection Group tabs accessible from a single page

The hierarchy tree config works with Inspection Groups and Attribute Forms but is in a separate admin module. They should all be on the same page for a unified workflow experience.
Arpit Prakash 4 months ago in SYNCHRO Control / Inspection 0

Add some kind of functions to provide evidence for contractor endorsement in reports

Refer to Bentley support case CS0280359 (attached file) or below: Knowing that the design rational for "Reports" module from support, which the report generated and submitted by one party (e.g. contractor) will be reviewed and approved by another ...
Tat Man Leung 3 months ago in Perform / Daily Diary & Reports 0

Ability to publish Form data with Location to ArcGIS

No description provided
Arpit Prakash 4 months ago in SYNCHRO Control / Admin 0

Ability to map data from Weather Widget Control to a fillable PDF

No description provided
Arpit Prakash 6 months ago in SYNCHRO Control / Forms 0

Work hours automatically populate when a rate code is inputted

When a worker is sick or on annual leave their hours differ depending on their contract, we would like to be able to input a rate code for a worker and the hours automatically populate based on a predetermined settings linked to their profile or role
Philip O'Donoghue about 1 month ago in Perform / Administration 0

Dissociate Plan Set admin setting from Edit project detail setting

Currently, if a Role only has Plan Set admin checked but not Edit Project Detail, they will not see Plan Set options under Admin. Project settings and Plan Set settings are relevant to different personas, so need not be connected.
Arpit Prakash 6 months ago in SYNCHRO Control / Admin 0

Ability to set Today's Date as a Binding in Forms

No description provided
Arpit Prakash 4 months ago in SYNCHRO Control / Forms 0

Link between documents under Documents/Connections and plant set

Since we can now display the saved search under Synchro field, it may be easier to find a document under Documents or Connections. From there if the document exist under Plan Set, a Go To link should exist to allow user to move back and forth betw...
Luc Poulin 3 months ago in Field / Documents 1

Audit Trail Enhancement

For modification to audit trails, we want a feature to view only the changes made to it, and not the entire content of the field/binding.This would help us to understand what the exact changes made to the form is and not just the entire content of...
Guest over 3 years ago in SYNCHRO Control / Forms 0 Future consideration