PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1297

Statusing - upt status of resources under resource group

Multiple users assign Resource Groups, especially for steel construction tasks (groups may be created by Assemby code or IFC Assembly). But we cannot see this assignment in Field, we must assign the resources which belong to the Group with neutral...
Daria Kosmala over 2 years ago in Field / Status update | Resources 0 Future Consideration

Resource & 3D User Fields that are created/updated in 4D to be accessible in Control, Modeler & Field

Resource & 3D User Fields that are created/updated in 4D to be accessible in Control, Modeler & Field. This is important because as we package work in 4D, populating these user fields would enhance QTO's in modeler (via queries) and filter...
Doug Theret almost 4 years ago in SYNCHRO 4D Pro 1 Planned

Ability to assign grid bound data to fillable PDF for export

Users would like to see reports in the pdf form that they are used to seeing. Therefore, custom export is not preferable over fillable pdf. As of now, I think the data captured via grid can be exported into a standard or custom pdf but not a filla...
Paolomee Udani over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Fast Option - Selection Level - Include Form

hi Dev Team, Now 4D Pro can access the Form. If can add the Fast Option feature to able to select Form, I think it may give some value. Also if there is any more easy way to see the connection between Form and Task also good. Thank you, Indrawan
Indrawan Wijaya over 1 year ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Will not implement

Improved condition for Auto-Matching

Guest almost 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

ProjectWise document connection Lower connection to Project Level

project framework then project top folders under that it would be good to be able to connect into a lower level of the folder structure so we can connect to areas specific to the control project
Alastair Barbrook over 1 year ago in SYNCHRO Control / Documents 0 Already exists

Selection when creating a profile

When "Profile" enabled from "Civi Tools", hide or show in transparent the elements that cannot be used to create a profile. Prompt message if nothing can be used in the iModel.
Shaohua Guan over 1 year ago in SYNCHRO Control / Civil Tools 0

Add 'Appearance Start' and 'Appearance End' properties under Task Properties>Resources>3D Path

Similar to 'Motion Start' and 'Motion End', add 'Appearance Start' and 'Appearance End' properties under Task Properties>Resources>3D Path. Currently, we have to create a new task and adjust dates to only show equipment during a portion of a...
Dennis Parker almost 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Load not whole model to Synchro Pro

imodel can be very big and user asking to load not whole model in Synchro Pro from Synchro Control. Load only part of imodel selecting Models or Categories you needed now for 4d.
Guest almost 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Add support for Notifiable Users to the Bulk Assign page

Bulk Assign currently allows a user to manage Owners, Subcontractors and Clients. This feature would allow Notifiable Users to be managed in the same way
Luke Read over 2 years ago in Perform / Program/Schedule Collaboration 0 Planned