Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1304

Improved condition for Auto-Matching

Guest almost 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Finer control over permissions

I need finer controll over permissions. I want users to only edit the comments or user Fields. I think that the administrator needs to be able to controll mutch more than he can today. We are using SWP and find it hard to set the Project up how we...
over 5 years ago in SYNCHRO 4D Pro 0 Already exists

No Report list open bids

These listed reports do not display open bids but displays awarded, closed to bidding, or cancelled.Bidders List Summary ReportBids By Category The report Bid Counts - Grouped displays open bids but not what the user requires or a report.
Guest over 2 years ago in Contracts / Exports 1 Future Consideration

Data Date line for Late tasks should not extend to start of task

One issue which I discussed with our managers yesterday was the lack of ability to illustrate accurately a jagged line. See below snap shot of the progress line with the late tasks switched on. As can be seen even when partial progress is show (in...
over 5 years ago in SYNCHRO 4D Pro 0 Planned

Dockets: allow users to have the ability to approve in bulk.

Although the Docket Inbox allows a user to approve multiple Dockets, it is limited to a single day and still requires the user to select dockets individually.
Luke Read over 1 year ago in Perform / Dockets 0 Future Consideration

Add 'Appearance Start' and 'Appearance End' properties under Task Properties>Resources>3D Path

Similar to 'Motion Start' and 'Motion End', add 'Appearance Start' and 'Appearance End' properties under Task Properties>Resources>3D Path. Currently, we have to create a new task and adjust dates to only show equipment during a portion of a...
Dennis Parker almost 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Load not whole model to Synchro Pro

imodel can be very big and user asking to load not whole model in Synchro Pro from Synchro Control. Load only part of imodel selecting Models or Categories you needed now for 4d.
Guest almost 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Import/Export Keyframe of 3D Path

Hello Team, I know that we can copy/pas keyframe as text . This function requires to realize for each 3D path. I wonder if there is any way to export Keyframe of 3D paths to excel file and import excel file to update keyframe of 3D paths. Thanks
Quan Son Nguyen over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

Statusing - upt status of resources under resource group

Multiple users assign Resource Groups, especially for steel construction tasks (groups may be created by Assemby code or IFC Assembly). But we cannot see this assignment in Field, we must assign the resources which belong to the Group with neutral...
Daria Kosmala over 2 years ago in Field / Status update | Resources 0 Future Consideration

Add Multiple Styles to Control in Form Design

I would like to apply different styles to control when needed, instead of building specific styles for each case. For example, I have a style for bold text and a separate style for underlined text that could be combined when needed. It would be ni...
Dillon Davis over 1 year ago in SYNCHRO Control / Forms 0 Future consideration