Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 253

Add User field Drop down list feature

Further to our Customer suggestion, it would be very usful to have a Drop down list feature for User defined Field. It could be the list with the values to be selected from the same formula in the field value, or (to save ASCII script text) is ref...
Pavel Khrapkin over 2 years ago in SYNCHRO 4D Pro 0

Showing all active Resources for a look ahead period

I am trying to generate look ahead prints with all active 3D resources visible for that look ahead period instead of just the active Resources of the Focus Time. Example: show all tasks in between 25th of July '22 and 21st of August '22.I would li...
Stephan Klotz over 2 years ago in SYNCHRO 4D Pro / Filters/Tables 1 Already exists

Adding point cloud support

It would be nice to have point cloud integration in Synchro, especially for site logistic planning. The google map or Infraworks model seems out of date most of time when we try to plan pump location and truck route in reality.
Guest almost 5 years ago in SYNCHRO 4D Pro 0 Future consideration

Support for IFC 4 and 4x1

I work with linear Projects. Trains, Roads, Bridges. Most of these Software have recently added IFC support, but only for the schema 4x1 because it's the only one that supports alignments. Please, add it. It's very painful to go back to dwg just b...
Guest about 5 years ago in SYNCHRO 4D Pro / Integrations 1 Future consideration

WBS/Codes grouping in Task/Resource usage spred

Please, make it possible to group tasks / resources in the task / resource usage spreadsheet by WBS/Codes, like Primavera does
Igor Saenko over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Selecting Task columns to be always visible

Selecting columns to be always visisble in the task list. For instance the ID and Name column to be always visible when scrolling to the right to other columns. This function is available in Excel
Stephan Klotz over 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Will not implement

Rollback UX improvements

Include roll back option as separate permissions in the roles. In large projects you don't want roll back to be available to everyone. Now we can't see what changes were made by who and what the impact is on the work that is done. There is also no...
Martijn Querner about 2 years ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

Multiple Colour Modes In 1 3D View

Being able to have multiple colour modes in 1 3D view will be very helpful as it allows you to be able to fully customize your outputs. An example of where this is useful could be showing the different pouring stages of concrete using activity tra...
Daniel Clayson about 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Will not implement

Importing from Revit with metric reverts unit to feet unless settings are adjusted in 3D Import dialog

There is one bug I have found, it’s an easy fix but took a while to figure out: When importing spx files from revit using the import project, it will assume the default unit as feet even though revit and synchro are both setup in metric. The way t...
Guest about 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Material Texture Option

photo texture/ texture to model- images mapped to the surface of model for realistic material.
ASHWIN RAJESH K over 1 year ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Already exists