PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1310

Able to Set Form Status for Multi Form Selected (SYNCHRO Form Manager)

Can set Form Status for Multi form Selected (in Form Manager) Current we must set the Form Status one bye one. Example: Set All Form Design to Draft. or Publish multi form in one click. Thank you.
Indrawan Wijaya about 2 years ago in SYNCHRO Control / Forms 1 Planned

Include GUIDs in cost code assignment summary export

Currently after user completes the cost code assignments in Modeler, the export/ summary does not necessary provide the GUIDs for the elements, therefore consultants or services colleagues don't have a way to bring cost codes to 4D Pro unless Mode...
Jacqueline Chen about 4 years ago in SYNCHRO Modeler 0 Planned

Anchoring of Camera with task during animation

It is useful because each time after importing revised or updated schedule with varied timeframe, we have to set camera which is very time taking and repeating. So, if we can avoid it by anchoring the camera with task it would much easier and time...
Vikash Singh about 2 years ago in SYNCHRO 4D Pro / Animations 0 Will not implement

Double click on animation keyframe to jump to focus time

When we would double click on a Key Frame would be good to snap to Focus Time.
Guest about 4 years ago in SYNCHRO 4D Pro / Animations 0 Planned

Based on 4D Pro's Task Name when creating a form.

When a user creates a form in 'My work', he wants to create it based on the Task Name of 4D Pro, like Perform. He said that it can be used to input the quantity value for each task in the field.
HoSang Jeon about 2 years ago in SYNCHRO Control / Forms 0 Future consideration

A New Task Filter Allowing You To Filter Based On Assigned Resources

We require this feature because we need a quick way of filtering tasks without/with any resources assigned after doing a programme synchronisation. Currently the only way to do this is by filtering the resources manually, however, when you import ...
Daniel Clayson about 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

To stop the imodel synchronising process

Possible to allow users to stop the synchronising process? Currently, users not able to stop the process once it is started, and not able to skip to the next model that is in the queue. Is there a way to skip the synchronizing process to the next ...
Guest about 4 years ago in SYNCHRO 4D Pro 2 Future consideration

Provide ability to set default location in map for Desktop users - Project Pin

When using the location functionality we have two options: Set location of a form or navigate to my location to see all submitted forms. In any case, when using the Desktop Control client, Map most likely defaults to US. We are in UK. When I click...
Kiril Tasev about 1 year ago in SYNCHRO Control / Forms 0

Ability to calculate slice lengths for slices made through Work Area from graphic tool

Currently, the Slice Lengths are only calculated for slices made through Quantity Take-Off View > Slice tools. The slices made through Area Break Down View > Work Area from the Graphic tool do not compute the lengths.
Arpit Prakash about 2 years ago in SYNCHRO Modeler 0 Needs review

To have performance percentage complete in Synchro

By default the performance percentage complete is built-in in P6, having performance percentage complete in synchro can directly display the percentage of earned value cost / budgeted total cost in a project.
Andy Fong about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration