PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1303

iModel on queued

When there is change on iModel, we always see that the iModel have this status " "Synchronozation queued". But we never know how long is the queue? Can we have button to make the Sync start? Why need to be on queue? as user, we need information......
Indrawan Wijaya almost 4 years ago in SYNCHRO Control / Models 0 Future consideration

Ability to calculate slice lengths for slices made through Work Area from graphic tool

Currently, the Slice Lengths are only calculated for slices made through Quantity Take-Off View > Slice tools. The slices made through Area Break Down View > Work Area from the Graphic tool do not compute the lengths.
Arpit Prakash almost 2 years ago in SYNCHRO Modeler 0 Needs review

Update Gallery UI with date organization in grid view of Media Explorer

When using photo storage like Google Photos - the UI for the gallery view is organized quickly by Dates. It also provides a very quick and simple date slider along the side to navigate to older dates. The date organization is a quick easy way to f...
Paul Johnson almost 2 years ago in SYNCHRO Control / Media Indexing 0 Future consideration

iModel for Revit files

When processing iModel, either through iTwein Synchronizer or the Webpage, all properties visible in Revit should be processed and stored in iModel and can be viewed on Control by default. Users should also be given options to select the model pro...
Shaohua Guan almost 4 years ago in SYNCHRO Control / Models 2 Already exists

3D Filters for assigned geometry

The users have lots 3D Objects that unassigned to the tasks. It would be useful if we can have a feature (like 3d filter) that will allow us to display only assigned geometry to the tasks I was trying to use Data Visualization tool, but I found it...
Guest almost 2 years ago in SYNCHRO Control / Models 0 Future consideration

Add the ability to clone Events

Similar to how it is possible to clone Activities, allow users (who have the appropriate level to access) to clone Events in the web app.
Duncan Turner almost 2 years ago in Perform / Events & Notices 0 Future Consideration

A New Task Filter Allowing You To Filter Based On Assigned Resources

We require this feature because we need a quick way of filtering tasks without/with any resources assigned after doing a programme synchronisation. Currently the only way to do this is by filtering the resources manually, however, when you import ...
Daniel Clayson almost 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

Include GUIDs in cost code assignment summary export

Currently after user completes the cost code assignments in Modeler, the export/ summary does not necessary provide the GUIDs for the elements, therefore consultants or services colleagues don't have a way to bring cost codes to 4D Pro unless Mode...
Jacqueline Chen almost 4 years ago in SYNCHRO Modeler 0 Planned

Form to Form Relationship(s)

Would like to add survey control to forms so we can have forms to forms relationships
Beth Buerger almost 2 years ago in SYNCHRO Control 0 Planned

Double click on animation keyframe to jump to focus time

When we would double click on a Key Frame would be good to snap to Focus Time.