Ability to provision SYNCHRO Control on Government cloud
Many times government entities (like nuclear power plant, transport authorities ) ask for the availability of SYNCHRO Control on the government/private cloud.
Model Viewer - Provide the option for users to change their Element Selection method from cumulative (each new element selected is added to the current selection) to a single-element select where tapping a new element creates a new selection.
Auto suggest existing Tags when entering a new tag when editing a Plan Sheet
As I type in a TAG for a plan sheet, if as I type there are existing tags that match the current pattern, suggest them to me. This allows me to pick from an existing tag and helps to maintain consistency avoiding typos as well as duplicate tags th...
Add setting option to change "Scope" from Element to Top Assembly
In Synchro Control, we can set the scope to "Top Assembly", which allows us to select part of a cell (from ORD/microstation) and the Properties tab will display the full parent element properties, which is where we have item type data attached. In...
Currently the installation won't allow the product to be installed on ARM processors within Windows. Allowing this should also enable "Mac OS" compatibility as many use Parallels Desktop, etc. With the new suite of Microsoft Surface Pros, etc, usi...
When processing iModel, either through iTwein Synchronizer or the Webpage, all properties visible in Revit should be processed and stored in iModel and can be viewed on Control by default. Users should also be given options to select the model pro...
A number of construction projects are now moving over to cloud hosted Asta environments. Currently Synchro 4D Pro can not connect to an asta project unless you have a the standalone software and licence on the same computer. The addition of an API...
Michael Thomas
about 2 years ago
in SYNCHRO 4D Pro / API
0
Future consideration
I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Include GUIDs in cost code assignment summary export
Currently after user completes the cost code assignments in Modeler, the export/ summary does not necessary provide the GUIDs for the elements, therefore consultants or services colleagues don't have a way to bring cost codes to 4D Pro unless Mode...
Jacqueline Chen
over 4 years ago
in SYNCHRO Modeler
0
Planned