Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule
Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro.
These layouts must include :
- Schedule Tasks Group and Sort,
- Schedules tasks filters,
- Relevant Schedule Tasks Attrib...
users and project team have feedback that SYNCHRO Control iModel navigation is laggy and slow. please look into the matter so that the model can orbit and rotate smoother and faster.
Ability to maintain folder mapping for PDF export through Forms Workflow
If a PDF is set to auto-export at a specific folder location within Documents, using Forms > Workflow > Transition, that path is not maintained through provisioning to a production project.
Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro
In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Enable GPS location of user on the model (the "blue dot"), based on the device location service, to allow a user to better orient themselves while on the construction site. UPD.: "As a field engineer, I want the mobile app to display my current lo...
Ability to manually save changes in Forms Designer
When designing large Forms, the performance heavily degrades on any action like selection, editing, etc, due to auto-save continuously running in the background. This could be a toggle to enable/disable as required.