Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 227

Implementing IFC 4X

Is IFC4X implementation and synchronization on the roadmap for the Synchro suite? Unfortunately I am not able to work with IFC 4X2 with the latest Synchro 4D Pro version: ================================================== Error: The schema [IFC4X...
Stephan Klotz over 1 year ago in SYNCHRO 4D Pro / Import/Export 1 Future consideration

Default to Window Placement #4

As an enterprise, we need the ability to default a window placement for our users. Our teams are used to seeing a similar layout to Window Placement number 4 in other CPM Scheduling Tools. We would like to scale the use of Synchro Scheduler to rep...
Thomas Whiteley over 1 year ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 0

For merging 2 SP files. the errors for synchronization option.

I think merging large SP file are common practice, however the merged file is loosing some feature of synchroniztion from option. which needs to be clarified. also the single xml file for the merged SP file when imported from P6 looses the resourc...
sanam Chhodar over 1 year ago in SYNCHRO 4D Pro / Integrations 0 Will not implement

Allow user to specify key used for mapping

When we import Excel File to SYNCHRO, It is good it can accept other data as the Mapping Key, not only the SYNCHRO Standard ID. Please check the PDF file attached in more details.
Indrawan Gmail over 1 year ago in SYNCHRO 4D Pro / Import/Export 4 Planned

Do Rotation Easily - 3D Object that not at 90degree position with XY axis

We have user complaining that it is difficult to do 3D if the 3D object not at 90degree position with the XYZ axis. Please check this video attached. May be by adding the Degree configuration at the Alignment can solve this one?
Indrawan Gmail over 1 year ago in SYNCHRO 4D Pro / Animations 0

Add User field Drop down list feature

Further to our Customer suggestion, it would be very usful to have a Drop down list feature for User defined Field. It could be the list with the values to be selected from the same formula in the field value, or (to save ASCII script text) is ref...
Pavel Khrapkin almost 2 years ago in SYNCHRO 4D Pro 0

Implement SYNCHRO 4D Equipment Library in navbar in Synchro 4D

Instead of downloading, choose which equipment i want and then importing the 3D objects equipment. Why not to just make this more easily and make this library in navbar where the window will show up with visualy equiment to chooce. Navigate throug...
Yasin Rafiq almost 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Will not implement

Showing all active Resources for a look ahead period

I am trying to generate look ahead prints with all active 3D resources visible for that look ahead period instead of just the active Resources of the Focus Time. Example: show all tasks in between 25th of July '22 and 21st of August '22.I would li...
Stephan Klotz almost 2 years ago in SYNCHRO 4D Pro / Filters/Tables 1 Already exists

Assign Resource Group to Task - New button

It is nive to have this new button. Assign Resource Group to Task. Please see image on the attachment.
Indrawan Gmail almost 2 years ago in SYNCHRO 4D Pro 0 Planned

Backspace /Undo command if mistake made when creating 3D Path Section

When creating a complex 3d path in Synchro, it would be nice to easily backspace a mistake when double clicking the wrong area. Currently have to finish the path then go back delete the Keyframe.
David McLaughlin almost 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Will not implement