Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1304

Ability to filter by WBS and Path

A good WBS is the core to most schedules and the ability to quickly filter by WBS levels or groups is a much used feature in P6 and other scheduling tools I would like to do in Synchro. The current work arounds I use are 1) Manually select the des...
Kristina Henkai about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Batch Render Viewpoint

I have several 3D still images for stagings that are saved in viewpoints. Everytime i need to activate then hit the report reder in iray button. Which means I will have to wait for all of my images to be rendered one by one. We should a have a bat...
Shuo Wang about 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 2 Planned

Enable Admin to see private form instances and reassign/unlock

Enable Private form instances to be seen by admins by default or for the privacy to be removed by the admin. Enable Admin to be able to reassign private forms to unblock flows. This function can be allowed at Itwin/PW co-admin level
Kiril Tasev 10 months ago in SYNCHRO Control / Forms 0

Traceability of changes on usage page

The engineers and finance teams wants to know who made any changes to Cost code through usage page after the docket have been received. Currently Synchro tracks any changes done on docket but doesn't have any functionality to check if any changes ...
Siddharth Sahare over 2 years ago in Perform / Resource Management 1 Future Consideration

enable transitions in offline mode

Some activities like inspections or witness poitns rely on multiple users beign on site and carrying an inspection. If satisfactory they will sign/certify the fact and can transition the flow between each other to do that. In offline mode this is ...
Kiril Tasev over 2 years ago in Field / Forms | Inspections 0 Future Consideration

At completion calculations

at completion calculation is depending on the duration and expected finish not the inputs of actual and remaining units as per primavera So we have the following: There is no input place for the at completion units on synchro like primavera P6 The...
Rana Hosney over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Export to Excel all filled out forms along with captured information like 3d objects and tasks

Currently you can export all the filled out forms to excel, but without the captured 3D object/resources (via Control->Dashboard->Export view to Excel). It will be usefull to export more information about issue, including captured 3d objects...
Igor Saenko about 3 years ago in SYNCHRO Control / Forms 0 Future consideration

When Adding a new User to SYNCHRO and I put their Full Name in the Name field their Name should actually show up rather than as FirstName LastName.

When Adding a new User to SYNCHRO and I put their Full Name in the Name field their Name should actually show up rather than as FirstName and LastName. If the User want to update their name at a later date this should be an option in their profile...
David Dudek 10 months ago in SYNCHRO Control / Forms 0

Bold text customization in SYNCHRO Inspections Forms

It would be beneficial on projects for the enablement of customized bolding of text in certain area in inspection forms. this allows for the end-user to ensure he doesn't miss important information. See attached .jpg for the current project im wor...
Doug Theret about 4 years ago in SYNCHRO Control / Inspection 1 Already exists

Include Assigned Users property in Power BI Connector

Currently, only AssignedTo property is read, but not AssignedUsers, which may contain multiple entries.
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Future consideration