Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1287

Include 3D Filters created from Pro in the Control iModel

Currently there is no easy way to access the 3D Filters created in 4D Pro in the Control model viewer. 3D Filters can be used to isolate objects and load models quickly.
Guest almost 4 years ago in [Archive] SYNCHRO 4D Review 1 Future consideration

export multiple escalated forms in one PDF

if form A is escalated to form B, each form need to be exported separately. have the option to export both forms in one PDF document if one form is escalated to another.
Siti Nurhazirah Mokmin almost 4 years ago in SYNCHRO Control / Reports 0 Future consideration

Test to see if notification is sent

No description provided
Kevin Vivien 9 months ago in SYNCHRO Control / Inspection 0

Admin transitions

When form is used by users, sometimes there are batch of them that need to be deleted/archived/changed to a specific status. In cases where form is deleted, that leaves a gap in the numbering system and questions further down the line, so it is be...
Kiril Tasev 9 months ago in SYNCHRO Control / Forms 0

Two point scale and rotate PDF that are not geolocated

Need a way to locate two known objects on the PDF and then the same spots on the map to move and rotate onto the pdf the map.
Dan Sheldon almost 4 years ago in SYNCHRO Control / Plan Sets 1 Future consideration

Activity Code Descriptions in the Scheduler

Primavera P6 allows for viewing activity code descriptions for grouping tasks rather than just the activity code. The activity code is usually a batch of symbols due to P6'es character limits for activity codes and that makes it a real pain in Syn...
Patryk Makowski 9 months ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 7

At completion calculations

at completion calculation is depending on the duration and expected finish not the inputs of actual and remaining units as per primavera So we have the following: There is no input place for the at completion units on synchro like primavera P6 The...
Rana Hosney over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Mandatory Fields on Events: Event Date and Event Category

Improve the data integrity of Events by making Event Date and Event Category mandatory on the creation of the Event.
Luke Read over 2 years ago in Perform / Events & Notices 2 Future Consideration

Physical Quantity distribution in Task Usage

It would be very helpful to see a physical quantity, its cost (or task cost) and their distribution in the "task usage report"
Varvara Kleshchevnikova almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Include Assigned Users property in Power BI Connector

Currently, only AssignedTo property is read, but not AssignedUsers, which may contain multiple entries.
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Future consideration