Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1304

Two point scale and rotate PDF that are not geolocated

Need a way to locate two known objects on the PDF and then the same spots on the map to move and rotate onto the pdf the map.
Dan Sheldon almost 4 years ago in SYNCHRO Control / Plan Sets 1 Future consideration

Allow filtering of roles for Assigned to in transition

When using transition we can use property Assigned To . Unfortunately at the moment Form designer only allows to choose one role. Please, allow multi selection of roles available for the Assigned To binding when used in transition.
Kiril Tasev 9 months ago in SYNCHRO Control / Forms 0

Do Rotation Easily - 3D Object that not at 90degree position with XY axis

We have user complaining that it is difficult to do 3D if the 3D object not at 90degree position with the XYZ axis. Please check this video attached. May be by adding the Degree configuration at the Alignment can solve this one?
Indrawan Gmail over 2 years ago in SYNCHRO 4D Pro / Animations 0

Ability to map field to more than one PDF location

Control only allows each field to map to one spot on a PDF. There are many fields were the information needs to be mapped to different locations on the PDF - like when each pdf page has data in the header. The Forms service has no limitation.... i...
Guest over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Versions of 3D models in iModel

This idea refers to using Synchro Control with an iModel with Projectwise Connections. When viewing the Connections I think it is essential to be able to see the version of the model, e.g. P03 or C06. The model version isn't listed on the Connecti...
Ruth Fuller over 1 year ago in SYNCHRO Control / Models 0

Give Project Admin More Control over Forms

1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...
David Dudek Jr. over 1 year ago in SYNCHRO Control / Admin / Forms 0 Future consideration

Physical Quantity distribution in Task Usage

It would be very helpful to see a physical quantity, its cost (or task cost) and their distribution in the "task usage report"
Varvara Kleshchevnikova almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Prompt when a new version of the design file is uploaded

On Control, if the design file has an update (a new version is created) -> prompt the user who uploaded the updated design file to synchronize the iModel with the new file
Shaohua Guan 10 months ago in SYNCHRO Control / Models 0 Likely to implement

Adding point cloud support

It would be nice to have point cloud integration in Synchro, especially for site logistic planning. The google map or Infraworks model seems out of date most of time when we try to plan pump location and truck route in reality.
Guest over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Synchro_Resource Leveling/takt planning

Myself, a synchro user from Germany.I have developed a 4D BIM simulation with concrete quantity forecast in my new project .Now I would like to do a Resource levelling or takt planning.The peak demands needs to be balanced .Is there any solution a...
Guest almost 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration