Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1312

Ability to Define Condition on Property Assignments during Transitions

I want to be able to define a condition for property assignments - One use case scenario is to automatically assign the Form to a User, based on a Project that was selected in the previous status.
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Planned

Grid control options

Grid control / Table functions needs improving, needs to function more like MS office. This tool is very difficult to use and can be very inconvenient. The grid control should also allow for limited horizontal inputs, allowing X and Y data as apos...
Ashley Edmonds over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Two point scale and rotate PDF that are not geolocated

Need a way to locate two known objects on the PDF and then the same spots on the map to move and rotate onto the pdf the map.
Dan Sheldon about 4 years ago in SYNCHRO Control / Plan Sets 1 Future consideration

Adding point cloud support

It would be nice to have point cloud integration in Synchro, especially for site logistic planning. The google map or Infraworks model seems out of date most of time when we try to plan pump location and truck route in reality.
Guest almost 5 years ago in SYNCHRO 4D Pro 0 Future consideration

Physical Quantity distribution in Task Usage

It would be very helpful to see a physical quantity, its cost (or task cost) and their distribution in the "task usage report"
Varvara Kleshchevnikova about 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Synchro_Resource Leveling/takt planning

Myself, a synchro user from Germany.I have developed a 4D BIM simulation with concrete quantity forecast in my new project .Now I would like to do a Resource levelling or takt planning.The peak demands needs to be balanced .Is there any solution a...
Guest about 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Send a document to PDFTron for conversion to PDF via a Web Service REST API

As a Bentley developer I want to be able to send a document to PDFTron (Apryse) via a Web Services API call for conversion into a PDF document. Expectation is that a PDF document is generated and available via an endpoint returned by the original ...
Paul Houghton 10 months ago in SYNCHRO Control / APIs 0

To use thousand separators when numbers are displayed in the form

When using the number box in the form, there is no thousand separator in the number displayed. This makes it hard to see the value, especially for large amount like hundred thousands and millions. However, if use text box, this doesn't allow the m...
Siti Nurhazirah Mokmin about 4 years ago in SYNCHRO Control / Forms 0 Future consideration

PDF Export – for photo drop Component not take spaces when there is no photos taken

On the PDF Design to export to PDF report – for photo drop Component not take spaces when there is no photos taken. Please see attachement.
Indrawan Gmail over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Synchro Control auto-emails to a daily or weekly digest

A way to set the Synchro Control auto-emails to a daily or weekly digest, instead of one email every time something happens.
Thomas Schimpf over 3 years ago in SYNCHRO Control / Reports 0 Future consideration