Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1284

Ability to have subproject

We need the ability to have multiple projects under one main project. I this example, see attached image. I have one main job number. And in this case 350 different airports or sub projects. Each project has the same folder structure in it. Right ...
Martin Price over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Include Assigned Users property in Power BI Connector

Currently, only AssignedTo property is read, but not AssignedUsers, which may contain multiple entries.
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Future consideration

Remove Cost Code from a selection of items

Want to delete a cost code from a number of items, not one at a time, and not all the items assigned to the cost code.
Dan Sheldon over 3 years ago in SYNCHRO Modeler 0 Planned

Compare button in Schedule view

The "Compare" button in the schedule viewer needs some tooltips or explanation on what its purpose is. What is the difference between the top and bottom slider buttons? It also seems a little "clunky" when sliding. See this attached video
Thomas Whiteley over 3 years ago in [Archive] SYNCHRO 4D Review 1 Future consideration

Default schedule focus time position in Schedule tab

Suggestion: When Schedule module is opened, focus time should be set to "Today". Also, the month filter should open to the current month rather than the beginning or end of the project.
Thomas Whiteley over 3 years ago in [Archive] SYNCHRO 4D Review 1 Planned

PDF Export – for photo drop Component not take spaces when there is no photos taken

On the PDF Design to export to PDF report – for photo drop Component not take spaces when there is no photos taken. Please see attachement.
Indrawan Gmail about 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Provide static table control

Further to CSPM-I-631: Provide static table control. To show a user defined table. User defined matrix e.g. 4 columns by 8 rows. First row set as table headings. Availability to populate cell data in the Form manager and/or through csv upload. Abi...
Kiril Tasev 8 months ago in SYNCHRO Control 0 Future consideration

Group vs Individual Saved View share setting behaviour

If a Group has multiple Saved Views within it, and we turn on Sharing, all the views become shared. However, if another non-shared View is added to a Shared Group, that and any other subsequent Views need to be individually shared manually. At th...
Arpit Prakash over 3 years ago in [Archive] SYNCHRO 4D Review 0 Future consideration

Group roles and users in 'Assign to'

In 'Assign To' and 'Multi Assign' it would be nice to have the users and the roles grouped together. For exampel 'Role: Designer' and then underneath that all the users in that role, and then the next role with associated users underneath that and...
Arnar Agustsson over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Do Rotation Easily - 3D Object that not at 90degree position with XY axis

We have user complaining that it is difficult to do 3D if the 3D object not at 90degree position with the XYZ axis. Please check this video attached. May be by adding the Degree configuration at the Alignment can solve this one?
Indrawan Gmail about 2 years ago in SYNCHRO 4D Pro / Animations 0