Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1304

Default schedule focus time position in Schedule tab

Suggestion: When Schedule module is opened, focus time should be set to "Today". Also, the month filter should open to the current month rather than the beginning or end of the project.
Thomas Whiteley over 3 years ago in [Archive] SYNCHRO 4D Review 1 Planned

Multiple Colour Modes In 1 3D View

Being able to have multiple colour modes in 1 3D view will be very helpful as it allows you to be able to fully customize your outputs. An example of where this is useful could be showing the different pouring stages of concrete using activity tra...
Daniel Clayson almost 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Will not implement

Provide ability to copy user group from Synchro into Projectwise to enable folder permissions

the Provide ability to copy user group from Synchro into ProjectWise to enable folder permissions. Currently, if a Form definition is set to output pdf to PW in transition, the PW admin will have to modify the permissions of each user individually...
Kiril Tasev 9 months ago in SYNCHRO Control / Forms 0

Add visual indicator to the PDF printout fields that have binding mapping done

hello, if a binding mapping is done for a field in the PDF printout, that field, should have some kind of indicator, indicating that itself has been mapped. please refer to the screenshot.
Shaohua Guan 9 months ago in SYNCHRO Control / Forms 0

add feature where multiple SYNCHRO to PDF binding pairs can be selected

hello, please add a feature where multiple SYNCHRO to PDF binding pairs can be selected at once. right now, only one can be selected at each time.
Shaohua Guan 9 months ago in SYNCHRO Control / Forms 0

clicking the fields in pdf printout will snap to the selected binding pair

hello, please add a feature, when clicking on a field in the pdf printout for forms, the SYNCHRO form to PDF form binding pair should be highlighted and centered.
Shaohua Guan 9 months ago in SYNCHRO Control / Forms 0

Enable privacy in forms exported through workflow into PW drive

Further to CS0185697 expectations are the logical inheritance of Forms behaviour e.g. If the "Is Private property is set to "True" then only Creator and the assigned users can see the form. consequentially if the form is then exported to the PW fo...
Kiril Tasev 9 months ago in SYNCHRO Control / Forms 0

allow full name of forms to be displayed when making choice from "Work" menu on the left.

Further to Case CS0187259. Currently, when user clicks on the Work menu item a list of available forms is displayed. This list is shown in static width floating window, therefore longer form names are truncated. It is imperative for the user to be...
Kiril Tasev 9 months ago in SYNCHRO Control / Forms 0 Future consideration

Group vs Individual Saved View share setting behaviour

If a Group has multiple Saved Views within it, and we turn on Sharing, all the views become shared. However, if another non-shared View is added to a Shared Group, that and any other subsequent Views need to be individually shared manually. At th...
Arpit Prakash over 3 years ago in [Archive] SYNCHRO 4D Review 0 Future consideration

Importing from Revit with metric reverts unit to feet unless settings are adjusted in 3D Import dialog

There is one bug I have found, it’s an easy fix but took a while to figure out: When importing spx files from revit using the import project, it will assume the default unit as feet even though revit and synchro are both setup in metric. The way t...
Guest almost 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration