Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1285

Saved views - hidden objects

Hi, It would be very useful if we can save under a Saved View the hidden objects. So basically I hide 3D objects to clear/isolate areas within the model, then I want to save the view and reuse it in future.
Alexandru Buzan about 3 years ago in [Archive] SYNCHRO 4D Review 0

Ability to Define Condition on Property Assignments during Transitions

I want to be able to define a condition for property assignments - One use case scenario is to automatically assign the Form to a User, based on a Project that was selected in the previous status.
Arpit Prakash about 1 year ago in SYNCHRO Control 0 Planned

Grid control options

Grid control / Table functions needs improving, needs to function more like MS office. This tool is very difficult to use and can be very inconvenient. The grid control should also allow for limited horizontal inputs, allowing X and Y data as apos...
Ashley Edmonds about 1 year ago in SYNCHRO Control / Forms 0 Future consideration

QR Code function

A control that allows a QR to be scanned. This would then link the QR to a document or a 3D model reference
Ashley Edmonds about 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Add multiple work areas at once

Besides the title, it would be great if one could also use 2D hatches to create work areas ( for example from AutoCAD)
Patryk Makowski 7 months ago in SYNCHRO Modeler 0 Needs review

Test to see if notification is sent

No description provided
Kevin Vivien 7 months ago in SYNCHRO Control / Inspection 0

Admin transitions

When form is used by users, sometimes there are batch of them that need to be deleted/archived/changed to a specific status. In cases where form is deleted, that leaves a gap in the numbering system and questions further down the line, so it is be...
Kiril Tasev 7 months ago in SYNCHRO Control / Forms 0

Activity Code Descriptions in the Scheduler

Primavera P6 allows for viewing activity code descriptions for grouping tasks rather than just the activity code. The activity code is usually a batch of symbols due to P6'es character limits for activity codes and that makes it a real pain in Syn...
Patryk Makowski 7 months ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 7

Site Diaries

A key part of construction is the maintenance of a site diary. It would be great if we were able to create site diaries which users can create and complete on a daily basis. Also have the ability to attach images to site diaries.
Guest over 5 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to have a GRID Control in Inspections

Ability to have a GRID Control in Inspections
Guest about 3 years ago in SYNCHRO Control / Inspection 0 Future consideration