Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1287

Ability to have a GRID Control in Inspections

Ability to have a GRID Control in Inspections
Guest about 3 years ago in SYNCHRO Control / Inspection 0 Future consideration

Provide ability to copy user group from Synchro into Projectwise to enable folder permissions

the Provide ability to copy user group from Synchro into ProjectWise to enable folder permissions. Currently, if a Form definition is set to output pdf to PW in transition, the PW admin will have to modify the permissions of each user individually...
Kiril Tasev 8 months ago in SYNCHRO Control / Forms 0

Add visual indicator to the PDF printout fields that have binding mapping done

hello, if a binding mapping is done for a field in the PDF printout, that field, should have some kind of indicator, indicating that itself has been mapped. please refer to the screenshot.
Shaohua Guan 8 months ago in SYNCHRO Control / Forms 0

add feature where multiple SYNCHRO to PDF binding pairs can be selected

hello, please add a feature where multiple SYNCHRO to PDF binding pairs can be selected at once. right now, only one can be selected at each time.
Shaohua Guan 8 months ago in SYNCHRO Control / Forms 0

clicking the fields in pdf printout will snap to the selected binding pair

hello, please add a feature, when clicking on a field in the pdf printout for forms, the SYNCHRO form to PDF form binding pair should be highlighted and centered.
Shaohua Guan 8 months ago in SYNCHRO Control / Forms 0

Enable privacy in forms exported through workflow into PW drive

Further to CS0185697 expectations are the logical inheritance of Forms behaviour e.g. If the "Is Private property is set to "True" then only Creator and the assigned users can see the form. consequentially if the form is then exported to the PW fo...
Kiril Tasev 8 months ago in SYNCHRO Control / Forms 0

allow full name of forms to be displayed when making choice from "Work" menu on the left.

Further to Case CS0187259. Currently, when user clicks on the Work menu item a list of available forms is displayed. This list is shown in static width floating window, therefore longer form names are truncated. It is imperative for the user to be...
Kiril Tasev 8 months ago in SYNCHRO Control / Forms 0 Future consideration

Please provide the ability to add a table to the forms

Our site team need the ability to add (copy/paste) excel tables into the forms, not to just attach the excel. Please activate the ability to do this
Keith Anthon almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Control Schedule not matching 4D Pro

Project schedule in Control is not matching 4D Pro. It seem to be showing the planned date in Control, rathe then the Actual date. I checked on another project and seen the same behavior. This user is obviously expecting to see the same Gantt/sche...
Roel Gonzalez over 3 years ago in [Archive] SYNCHRO 4D Review 1

WBS/Codes grouping in Task/Resource usage spred

Please, make it possible to group tasks / resources in the task / resource usage spreadsheet by WBS/Codes, like Primavera does
Igor Saenko almost 4 years ago in SYNCHRO 4D Pro 0 Future consideration