Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1165

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas about 1 year ago in SYNCHRO Control / Models 7 Future consideration

Navisworks Exporter - Limit User Fields like the Revit Exporter

The .spx exporter in Revit has the ability to limit the number of Userfields exported from Revit. I think it would be a great idea to have the same function built into the Navisworks Exporter. Currently, it exports all Userfields and values and th...
Preston Williams about 2 months ago in SYNCHRO 4D Pro / Microstation/Revit/Navisworks Plugins 0

Show / Hide Polylines Setting similar to 4D pro setting.

Ability to remove linework from Imodel as this does not got linked to the model in Synchro 4D pro.
Joe Griffiths 27 days ago in SYNCHRO Control / Model Viewer 0

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest over 1 year ago in SYNCHRO Control / Admin 0 Future consideration

Properties selection

Currently you can only select 1 item and identify properties in the model. When selecting more than 2 items, even if they are apart of the same system, the model is unable to give the properties. Would you be able to adjust this feature so that yo...
Helen Whitcher 3 months ago in SYNCHRO Field / Models | Tools 0

Show Binding in Published state when logged as Admin

When troubleshooting or finetuning a Form or a workflow it is required not only to see the Label/Control but also to see the Binding name in the published live state of a Form definition. Please, allow, when logged as an admin, to be able to see t...
Kiril Tasev 27 days ago in SYNCHRO Control / Forms 0

Creating a Synchro project for Augmented Reality (AR)

Creating a Synchro project for Augmented Reality (AR) on mobile devices would be highly desirable. This would enable users to experience visualizations while being outdoors, allowing them to see virtual elements seamlessly integrated into the real...
Yasin Rafiq 9 months ago in SYNCHRO 4D Pro / Animations 1

Allow for deleting multiple Work Areas at once

Manual deletion of 50+ Work Areas is such a pain.
Patryk Makowski 3 months ago in SYNCHRO Modeler 0 Needs review

Manage the continuity of forms from design to construction.

Provide continuity to the project lifecycle by generating a procedure to transfer the forms created in the Design stage (with a project created in the infrastructure cloud portal) to the Construction stage (with a project created in the synchro co...
Guest 29 days ago in SYNCHRO Control / Forms 0

Expand subcontractor user permission

Allow Subcontractors to manage people data and supervisor roster, and run the Usage / Attendance / Exception reports / people exports
Duncan Turner 4 months ago in SYNCHRO Perform / Administration 0 Future Consideration