Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1312

Allow Date check for past event

In many occasions we use date for something that is yet to happen. Yet the user can input a date in the past. Having the ability to restrict the date for future events as related to the date of input of information would avoid this kind of errors.
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Add more details to delete attachment dialog

To prevent users from accidentally deleting the wrong attachments, it would be good to add more details to the delete dialog that pops up. Currently, it just asks the users whether they want to delete the attachment, without an indication to show ...
Arnar Agustsson about 2 years ago in SYNCHRO Control 1 Future consideration

Ability to map the date tied with a Signature control seperately to a fillable pdf

Arpit Prakash 8 months ago in SYNCHRO Control / Forms 0

Place the attachments in a PW folder

Each time attachments are added to a form, they should be saved directly to a specific folder in the project.
Yessica Andrade Barbosa 8 months ago in Field / Documents | Connections 0

Expand on visibility assignments for roles and users

Quite often (almost every multi contractor form) requires visibility to be restricted to Client and anyone in the Creator's organisation. We currently manage this by asking the user to assign a role set up for their company to the AssignedUsers pr...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 1 Future consideration

As a user configuring inspections, I'd like the ability to download the inspection configuration file .xlsx I have previously loaded into SYNCHRO Control. This is so that I can correct mistakes, add more to the WBS/Spec, etc.

Any user configuring inspections will benefit from this as it allows to correct mistakes. Additionally, if the user making the adjustments is not the same as the user making the original configuration then this new user can go to SYNCHRO Control t...
Mariano Colicchio about 2 years ago in SYNCHRO Control 0 Planned

Russian Language

Hi! Could you add Russian Language to Synchro Field and Synchro Control
Nikita Menshikov over 3 years ago in SYNCHRO Control / Admin 3 Future consideration

Selecting Task columns to be always visible

Selecting columns to be always visisble in the task list. For instance the ID and Name column to be always visible when scrolling to the right to other columns. This function is available in Excel
Stephan Klotz over 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Will not implement

BIM360 integration

Idea: To integrate with BIM360 - ability to connect Control Documents to Revit design models stored in BIM360 Reason: BIM360 is one of most popular CDE, it would shortened the way to create and update imodels
Daria Kosmala over 3 years ago in SYNCHRO Control / Documents 0 Future consideration

Saved views - hidden objects

Hi, It would be very useful if we can save under a Saved View the hidden objects. So basically I hide 3D objects to clear/isolate areas within the model, then I want to save the view and reuse it in future.
Alexandru Buzan over 3 years ago in [Archive] SYNCHRO 4D Review 0