Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1287

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy - by adding the required inspections to the items / tags. Currently the WBS shows the parent / child / items so work scope; post import is not visi...
Guest over 3 years ago in SYNCHRO Control / Inspection 0 Planned

Expand workflows to support automated assignment to previous users

We find the need to expand the built in user controls like Previous action/status user that will allow simple automation to return the flow to the originator in multistep flows.
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to save Civil Tools Views

Users want to be able to save profile/cross-section views, with any visible measured dimensions. We should be able to save it to local drive/documents/included in saved views. The use case is to share the information and also attach to Forms. Curr...
Arpit Prakash over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Create a Form within a Form

Forms Manager being able to create a Form within a Form. For example; offering the functionality to directly create a punchlist from an Inspection if there's a deviation / breakage / nonconformance; the user can create a Punchlist without having t...
Guest over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Incorporation of an "Undo" feature within the measurement tool

incorporate an "undo" button while you are using any of the civil tools. For example, being able to use the "station/Offset" tool 10 times and only "undoing" the last 3 measurements taken instead of all the 10.
Tony Bonacorsi about 1 year ago in Field / Models | Tools 1 Future Consideration

Enabling measurement tools to convert between different units of measure

have the ability to convert an area measured from Square Feet to Square Yards or Acres automatically with a click of a button like Google Earth's Capability.
Tony Bonacorsi about 1 year ago in Field / Models | Tools 1 Future Consideration

Show Binding in Published state when logged as Admin

When troubleshooting or finetuning a Form or a workflow it is required not only to see the Label/Control but also to see the Binding name in the published live state of a Form definition. Please, allow, when logged as an admin, to be able to see t...
Kiril Tasev 7 months ago in SYNCHRO Control / Forms 0

PDF Plan set setting Bulk Edit

When editing the the PDF plan set it would be beneficial to bulk edit items such as Discipline Dates, Type to make initial publishing and QC corrections more efficient
Bill McNamara over 4 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Manage the continuity of forms from design to construction.

Provide continuity to the project lifecycle by generating a procedure to transfer the forms created in the Design stage (with a project created in the infrastructure cloud portal) to the Construction stage (with a project created in the synchro co...
Guest 7 months ago in SYNCHRO Control / Forms 0

Synchro control add more than one project at a time

Ability to add more than one project in synchro control
Guest about 1 year ago in SYNCHRO Control / Schedule 0