Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1338

Saved views - hidden objects

Hi, It would be very useful if we can save under a Saved View the hidden objects. So basically I hide 3D objects to clear/isolate areas within the model, then I want to save the view and reuse it in future.
Alexandru Buzan over 3 years ago in [Archive] SYNCHRO 4D Review 0

WBS/Codes grouping in Task/Resource usage spred

Please, make it possible to group tasks / resources in the task / resource usage spreadsheet by WBS/Codes, like Primavera does
Igor Saenko over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Filter tasks using Activity Codes

Filter Schedule by Activity Code
Joe Griffiths 9 months ago in SYNCHRO Control / Schedule 1

Ability to use Baseline Dates for EVA Graph and Resource Utilization Graph

Hi everyone, Our 4D Animations from Synchro 4D Pro are created as Baseline Dates vs Actual Dates. There is an option to set the dates for 3D Windows in the 3D View Properties Tab, but the same option is not avaiable for EVA Graph and Resource Util...
Sourav Kumar 9 months ago in SYNCHRO 4D Pro / Animations 0

Ability to have a GRID Control in Inspections

Ability to have a GRID Control in Inspections
Guest almost 4 years ago in SYNCHRO Control / Inspection 0 Future consideration

Integrate Rules of Credit into mobile app (properly)

Currently the rules of credit progress update interface is an 'iwindow'(?) which completely crashes when opened in the windows app.It is currently only available as an add-on you need to request. It is already a tabbed viewer, it doesnt make any s...
Rick Winsor 9 months ago in EVM (Perform) / SYNCHRO Perform Mobile 0 Future Consideration

Roll up progress/costs to WBS parents

Currently there is no relation between tasks and their subtask, even in rules of credit, you could have all subtasks at 100% but the parent still sits at 0% as a manual input.
Rick Winsor 9 months ago in EVM (Perform) / Progress Measurement 0 Future Consideration

Allow scope items to have "Create and Add Another"

Creating hundreds of scope items is tedious and if we are not allowed to use an upload spreadsheet, this would at least eliminate 5 mouse clicks per ite,
Rick Winsor 9 months ago in EVM (Perform) / Administration 0 Future Consideration

Transmittals or submittal

Can submittals and transmittals be generated from a Control Project? Either from within or via ProjectWise?
Guest over 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Information Density

Make the info density higher to get a better usage of the space
Luc Poulin 9 months ago in Field / Forms 0