Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1285

allow full name of forms to be displayed when making choice from "Work" menu on the left.

Further to Case CS0187259. Currently, when user clicks on the Work menu item a list of available forms is displayed. This list is shown in static width floating window, therefore longer form names are truncated. It is imperative for the user to be...
Kiril Tasev 6 months ago in SYNCHRO Control / Forms 0 Future consideration

Add tool to turn on/off pins

When in the Clash Detection module, I would like a tool (similar to the one in the forms) that turns on/off the pins. If I want to turn on or off the clash pins, I need to switch to the Forms panel currently. Possibly move the pin display tool fro...
Paul Johnson 12 months ago in SYNCHRO Control / Clash Detection 0

Add Responsible Company Filter to Work Inspector

Add Responsible Company Filter to Work Inspector. This has been requested by McDermott Project Controls.
Duncan Turner over 1 year ago in Perform / Performance Management 1 Future Consideration

Custom Forms - Mass fill bindings with excel import/export

Instead of having to select and create bindings on each control in the form designer. It would save allot of time if there was an export with all the controls and bindings, where we could mas assign binding and import back into SYNCHRO Control
Thomas Schimpf about 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Wrap Text for Activity Name

We have very Detailed activity names, and even after Reducing the Task Indent Space reading activity name is still difficult. If we expand the Activity name column then the Activity Start and Finish date will disappear behind the Gantt. Wrap text ...
Sagar Soni over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Setting for appearance profile behavior for overlapping tasks

When there is one resource assigned to multiple overlapping tasks the behavior regarding which profile should be shown is not consistent. This idea adds a setting that would make it consistent. This is how the setting should work: Scenario 1 Given...
Tom Fry 6 months ago in SYNCHRO 4D Pro 1

Assign by Query

When we create the Json File for the Query. If there is any group that do not contains components, the query does not run. We need to delete those groups. It is good if the assignment still run like normal, only ignore the empty group. Please see ...
Indrawan Gmail about 2 years ago in SYNCHRO Modeler 0 Needs review

expose version right before model synchronization

hello! on Control, when synchronizing model, would be nice to have the version along with the file name.
Shaohua Guan 6 months ago in SYNCHRO Control / Models 0 Future consideration

Associate multiple map locations and model locations with one form

Hello - nysdot mentioned it would be nice to have the capability where multiple map locations and/or multiple model locations can be added to the same single form
Shaohua Guan 6 months ago in SYNCHRO Control / Forms 0 Future consideration

PDF Export able bring the Escalate or Link Form data

I think to have the Link or Escalate Form data in the PDF output will be benefit for the project.
Indrawan Gmail about 2 years ago in SYNCHRO Control / Forms 0 Future consideration