PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1308

Connection between the form document number and Synchro ID column

Having the form document number and Synchro ID column the same is beneficial to each project member as they do not need to open each file to check on what they are looking for. They can straightaway see it from the ID column listed. During form c...
Kimberly Nazareth Angeles about 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Can progress be performed without 3D

For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
Derryl Acosta almost 4 years ago in Field / Status update | Tasks 1 Planned

Add basic ability to markup uploaded images/photos

It would be useful to be able to: Take image with your mobile have ability to add notes, text have ability to add simple markup e.g. line, circle, rectangle been able to choose the colour of the shapes, font Case scenario: Reinforcement cage is de...
Kiril Tasev about 2 years ago in SYNCHRO Control / Forms 0 Future consideration

ISO 19650 Compliance

It appears that your are not able to use ISO 19650 compliant numbering and that your numbering style still following a very basic 30 year out style of numbering. Please re-code and rectify this asap.
Keith Anthon about 2 years ago in SYNCHRO Control / Forms / Plan Sets 0 Future consideration

Add a Control for just Time

Currently, we have a control for Date/Time, a separate for Date, but not for Time.
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Ability to Filter by Float Path

Its important to be able to back track logic and the drivers in a particular string or path. In other scheduling software, I do this by filtering or grouping by Float Paths. This allows the team to analyze driving activities quickly. Furthermore w...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Planned

Ability to move files seamlessly between PW and Control > Documents

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Ability to bulk update Document Folder Access

Currently, the way this is set up is to remove access for one Role, all other Roles need to be given access, by manually checking on each. If we had a bulk update option, it will be easier to simply remove the restricted users.
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Ability to receive periodic reports of Forms assigned to a user

Admin should be able to specify which Form types should be part of a daily report, that gets sent out periodically to the assigned users.
Arpit Prakash over 1 year ago in SYNCHRO Control / Reports 0 Future consideration

Wrap Text for Activity Name

We have very Detailed activity names, and even after Reducing the Task Indent Space reading activity name is still difficult. If we expand the Activity name column then the Activity Start and Finish date will disappear behind the Gantt. Wrap text ...
Sagar Soni almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration