Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1322

growth simulation to follow 3D path (or polyline)

eg. centerline of pipe, building facade, or curved road
Kate Hester about 8 years ago in SYNCHRO 4D Pro 0 Future consideration

Implementing IFC 4X

Is IFC4X implementation and synchronization on the roadmap for the Synchro suite? Unfortunately I am not able to work with IFC 4X2 with the latest Synchro 4D Pro version: ================================================== Error: The schema [IFC4X...
Stephan Klotz over 2 years ago in SYNCHRO 4D Pro / Import/Export 1 Future consideration

Capability to extract the list users and their roles across all projects

For Acct reviews and stocktaking of all the roles and users across all projects.
Guest over 4 years ago in SYNCHRO Control / Admin 0 Planned

Functionality for User Fields when using iModel connectors

When a 3D model is imported directly into a Synchro Control project within the Synchro 4D Pro application (using File > Import), it is possible to create user fields. For example, I could import a 3D model and then I could set up a User Field c...
Ruth Fuller almost 2 years ago in SYNCHRO Control / Models 0

Resource Status - Update percentage base of quantity

If a task is planned for 10 days to pour 100 cubic meters of concrete. The user would like to be able to update the quantity (cubic meters) using the Field app - Status update
Paolomee Udani almost 4 years ago in Field / Status update | Resources 0 Planned

Work Area Tool Start Location should have option to use project stationing

Right now the tool always starts at zero, however, this may not be the desired project stationing. Eg. Start Station property is 499+99.1 in the following Alignment - It would be ideal to give users the choice.
Arpit Prakash almost 2 years ago in SYNCHRO Modeler 0 Needs review

Easier Location of equipment using synchro field

In a big site where you have thousands of supports, piping and cabinets in various floors, It is practically difficult locating installed equipment on site. as the equipment are only liked via schedule, because everything is greyed out, you don't ...
Gareth Odiakose 8 months ago in Field / Status update | Tasks 0

Ability to undock iModel 4D Viewer and/or Task list in the Schedule module

It would be nice to use multiple monitors to review an expanded Task list on one screen, the 4d model on the other. Currently everything gets pretty cramped within one screen, and will get worse when additional columns for Tasks are made available...
Arpit Prakash almost 4 years ago in SYNCHRO Control / Models 0 Future consideration

Ability to jump between 2D Sheets and 3D Model Views seamlessly

Currently, we can switch from 2D sheets to the previously opened 3D View in SYNCHRO Control, using the following back button - Need something similar for Field as well.
Arpit Prakash almost 2 years ago in Field / Models 1 Future Consideration

Audit Trail in Modeler

When errors are made in cost code assignments it is cumbersome to go back a review the entire model. Having an audit trail feature will pinpoint all actions made, when they were made and by whom to expedite remedying issues. It also will assist in...
David Gallaher almost 2 years ago in SYNCHRO Modeler 0 Future consideration