Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 468

Downloaded Document

at Downloaded Document, it has Delete button. Actually this delete button will delete the file in Control Document. This can make user miss understand the purpose of this button. Need to have better description for the Delete button and for the Re...
Indrawan Wijaya over 4 years ago in SYNCHRO Field / Documents | Documents 0 Planned

Form Model location should include visibility

Model location should include selection, visiblity, view, basically Model location should behave like Saved View.
Jacqueline Chen over 4 years ago in SYNCHRO Field / Models | Display 0 Will not implement

Station offset to overlay with map

Watch this season plan activity: PDCGTM-436Vincas It is a competitor https://instacei.com/home InstaCEI - Highway Construction SoftwareThe essential software for highway construction. Collect, share and act on data real-time from any device, all i...
Jacqueline Chen over 4 years ago in SYNCHRO Field / Models | Tools 0 Will not implement

multiple form workflows

check sheet fail brings up new issue and new NCR. if a function is triggered it brings up a new issue form / ncr
Alastair Barbrook about 2 years ago in SYNCHRO Control 1

Change term "Break Duration" to "Unpaid Break Durations"

The functionality of the "Break Duration", particularly in the App is to reduce the paid period and therefore should be more clearly identified as an unpaid period to avoid inclusion of paid break durations and thereby having these periods wrongly...
Ernest Downes about 2 years ago in SYNCHRO Perform / SYNCHRO Perform Mobile 1 Future Consideration

Allow display of WBS code in the quantity progress page

We frequently handle multiple activities with similar names due to similar nature in the same programme (e.g. submissions and approvals of similar installations). Without WBS code it is difficult to identify which specific work package it is about.
Pak To Hui about 2 years ago in SYNCHRO Perform / Progress Measurement 2 Future Consideration

Expose clearing cache in Field app to non technical users

Clearing the cache and updating the data usually solves random glitches in the Field App. There are potentially a lot of non technical savvy users that would struggle to get to the relevant menu as is (More-Settings-General-clear cache). It will b...
Kiril Tasev about 2 years ago in SYNCHRO Field / Settings | User experience 3 Will not implement

Include filter for start and finish dates in the activity list view

To include actual start and finish date in the filter to view activities under the framework of the WBS.
Pak To Hui about 2 years ago in SYNCHRO Perform / Progress Measurement 3 Future Consideration

To include percent complete at the activity list

Would it be possible to use a % complete tag to replace the fixed icon at the shortcut to progress tab?
Pak To Hui about 2 years ago in SYNCHRO Perform / Progress Capture 3 Future Consideration

Add Fields to Status Updates

We are trying to track quantities of units installed by our field personnel. It would be great if they could status the task then enter the quantity of material installed. It would be nice if there was a comments field added as well so they could ...
Guest over 4 years ago in SYNCHRO Field / Status update | Resources 1 Planned