Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1342 of 1342

Custom icon or icon library to represent custom form types on the map and model.

Allows a user to differentiate between other items on the map. The user would have the option when creating the custom form in the UI forms designer to assign an icon to it.
Guest about 5 years ago in SYNCHRO Control / Maps / Models 1 Planned

Ability to save Civil Tools Views

Users want to be able to save profile/cross-section views, with any visible measured dimensions. We should be able to save it to local drive/documents/included in saved views. The use case is to share the information and also attach to Forms. Curr...
Arpit Prakash over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Create a Form within a Form

Forms Manager being able to create a Form within a Form. For example; offering the functionality to directly create a punchlist from an Inspection if there's a deviation / breakage / nonconformance; the user can create a Punchlist without having t...
Guest over 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Reality data in Synchro Field app

It would be a great use case if engineers can view the reality data photogrammetry in the Synchro Field app similar to Synchro Control
Janaki Sundaram over 1 year ago in Field / Models | Views 0 Future Consideration

Filter form status in Schedule view

When managing form with multiple instances it is necessary to be able to filter out some of the statuses and work on the rest. i.e. in attached to filter out the backlog, not suitable and rejected and just leave the live instances. Either by allow...
Kiril Tasev 9 months ago in SYNCHRO Control / Forms 0

Add ability to choose your own fields to sort by in MY WORK

Please add the same ability to pick and choose your own 'view' using the project specific fields that have been filled out in the MY WORK area. ( pic 1 ) Same ability as has been give under the individual forms ( pic 2 ) This will give our contrac...
Irena Seleznjova 9 months ago in SYNCHRO Control / Forms 0

PDF geolocation by level for building

When using Synchro for a large building construction, we would like to have the possibility to along with the geolocation (X,Y) add the height to represent the different floor of the building. This will be important as some PDF will share the same...
Luc Poulin over 1 year ago in SYNCHRO Control / Plan Sets 0

Assign by Query

When we create the Json File for the Query. If there is any group that do not contains components, the query does not run. We need to delete those groups. It is good if the assignment still run like normal, only ignore the empty group. Please see ...
Indrawan Gmail almost 3 years ago in SYNCHRO Modeler 0 Needs review

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Ability to move files seamlessly between PW and Control > Documents

No description provided
Arpit Prakash about 2 years ago in SYNCHRO Control / Documents 0 Future consideration