PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1341

The method to define separator used in automatching rule must be refined

When a separator is defined anything that is written in the separator option is considered a separator. This becomes an issue when the client uses one of the separators while defining element code or task code. The rule doesn't work properly. Exam...
Jerry David Jaypaul over 1 year ago in SYNCHRO 4D Pro 2

refreshing browser does not land at where I was in browser. Retain view after refresh

When looking at a schedule of instances of a list of forms (more than 1000 instances) to get to a specific range of instances I have to click multiple times on the paginated list at the bottom of the register. Once there if I press F5 or refresh t...
Kiril Tasev over 1 year ago in SYNCHRO Control 0 Future consideration

Ability to re-assign/copy forms

This is possible in Control, but not in Field.
Arpit Prakash over 1 year ago in Field / Forms | Forms / Forms | Inspections 0 Future Consideration

Project filtering by filters or activity codes

the goal is to filter the 4D view to today's or next week's work for the specific role based user viewing the 4D model, pref. based on activity codes, 3D or tasks filters (like SITE used to have!)
Joost Wijnen about 4 years ago in Field / Models | Display 0 Future Consideration

Ability to move files seamlessly between PW and Control > Documents

No description provided
Arpit Prakash about 2 years ago in SYNCHRO Control / Documents 0 Future consideration

Ability to bulk update Document Folder Access

Currently, the way this is set up is to remove access for one Role, all other Roles need to be given access, by manually checking on each. If we had a bulk update option, it will be easier to simply remove the restricted users.
Arpit Prakash about 2 years ago in SYNCHRO Control / Documents 0 Future consideration

Ability to receive periodic reports of Forms assigned to a user

Admin should be able to specify which Form types should be part of a daily report, that gets sent out periodically to the assigned users.
Arpit Prakash about 2 years ago in SYNCHRO Control / Reports 0 Future consideration

Add multiple work areas at once

Besides the title, it would be great if one could also use 2D hatches to create work areas ( for example from AutoCAD)
Patryk Makowski over 1 year ago in SYNCHRO Modeler 0 Needs review

Support for 3D Connexion mouse

No description provided
Guest over 5 years ago in SYNCHRO 4D Pro / Integrations / SYNCHRO Open Viewer 3 Future consideration

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy - by adding the required inspections to the items / tags. Currently the WBS shows the parent / child / items so work scope; post import is not visi...
Guest about 4 years ago in SYNCHRO Control / Inspection 0 Planned