Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1342 of 1342

Ability to save Civil Tools Views

Users want to be able to save profile/cross-section views, with any visible measured dimensions. We should be able to save it to local drive/documents/included in saved views. The use case is to share the information and also attach to Forms. Curr...
Arpit Prakash over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Create a Form within a Form

Forms Manager being able to create a Form within a Form. For example; offering the functionality to directly create a punchlist from an Inspection if there's a deviation / breakage / nonconformance; the user can create a Punchlist without having t...
Guest over 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Scaling of 3d object even after path is assigned

Unable to scale a 3D equipment after 3D path assignment and resource assignment to the task. Now, the erection scheme may change according to site conditions; in this case, to fix it, we always have to delete the 3D path and then recreate it, whic...
Vishal Khurana 9 months ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Reality data in Synchro Field app

It would be a great use case if engineers can view the reality data photogrammetry in the Synchro Field app similar to Synchro Control
Janaki Sundaram over 1 year ago in Field / Models | Views 0 Future Consideration

Filter form status in Schedule view

When managing form with multiple instances it is necessary to be able to filter out some of the statuses and work on the rest. i.e. in attached to filter out the backlog, not suitable and rejected and just leave the live instances. Either by allow...
Kiril Tasev 9 months ago in SYNCHRO Control / Forms 0

Assign by Query

When we create the Json File for the Query. If there is any group that do not contains components, the query does not run. We need to delete those groups. It is good if the assignment still run like normal, only ignore the empty group. Please see ...
Indrawan Gmail almost 3 years ago in SYNCHRO+ 0 Needs review

PDF geolocation by level for building

When using Synchro for a large building construction, we would like to have the possibility to along with the geolocation (X,Y) add the height to represent the different floor of the building. This will be important as some PDF will share the same...
Luc Poulin over 1 year ago in SYNCHRO Control / Plan Sets 0

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.

For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas over 3 years ago in SYNCHRO Control 1 Future consideration

Ability to move files seamlessly between PW and Control > Documents

No description provided
Arpit Prakash about 2 years ago in SYNCHRO Control / Documents 0 Future consideration