Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1303

Add support for BCF

https://en.wikipedia.org/wiki/BIM_Collaboration_Format
over 5 years ago in SYNCHRO 4D Pro / Integrations / SYNCHRO Open Viewer 3 Future consideration

Within the PDF Plan sets text search

I would like a "google" like search of all the text to locate street names and lot numbers across the PDF set. I would like to search for the matching sheets and when in the sheet see the matching text strings
Bill McNamara over 4 years ago in SYNCHRO Control / Plan Sets 0 Already exists

matrix of assigned users to forms in a project or group of projects

When onboarding and specifically when removing people from forms it would be useful to have the ability to export/download a matrix of users vs assigned to forms. That would help maintain visibility over which forms the user has a role in.
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Infrastructure Cloud - Help Link only Show ProjectWise Link

When we use Infrastructure Cloud Link, and open SYNHCRO project, the Short Cut Link in top Right (just before Profile) still show ProjectWise link. I think need to change to SYNCHRO if we are opening SYNCHRO Project.
Indrawan Wijaya 6 months ago in SYNCHRO Control / Admin 0

We want to be able to run a report which could create an "Audit Trail" by User ID.

In SYNCHRO control would like to have an option to run a report which would create an "Audit Trail" by user ID or task. Almost like a key stroke report. There are times when our users are working on multiple functions in SYNCHRO and at the same po...
David Dudek Jr. almost 2 years ago in SYNCHRO Control / Admin 0 Future consideration

"Categories"needs to be an advanced search and data visualization option

There is no way to save a search based on Categories (or level names). Categories (level names in dgns) have significant meaning in the models. Being able to search for a group of categories that have a descriptive word (rebar, top, abut, etc) is ...
Guest over 1 year ago in SYNCHRO Control / Models 0

Ability to map the date tied with a Signature control seperately to a fillable pdf

Arpit Prakash 6 months ago in SYNCHRO Control / Forms 0

Place the attachments in a PW folder

Each time attachments are added to a form, they should be saved directly to a specific folder in the project.
Yessica Andrade Barbosa 6 months ago in Field / Documents | Connections 0

provide upload of editable bindings in flow state definition

When we create Form we can now download the form definition. From there it is very easy to create an excel file with the Editable bindings per status. Having option to upload this into the state definition will speed up the development and tweakin...
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 1 Future consideration

Bi-Directional Selection of 3D Element and Model Tree

When an element is selected in 3D the model tree should jump to the element
Mike Ranney over 3 years ago in [Archive] SYNCHRO 4D Review 0