Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1304

Add a Pin on a Form

There Should be a possibility to set a Control with a pin. That means when you choose it you should be able to set a Pin to save this Control Value. E.G: when you collect defects on the same level you don't need to fill the Level every time for ea...
Alexander Koenig 6 months ago in SYNCHRO Control / Forms 0

Add Company Filter to the Resource Usages For Import

Can we add a Company Filter to the 'Resource Usages For Import', this will be helpful to allow us to export hours entered by subcontractor companies.
Duncan Turner over 1 year ago in Perform / Timesheets 1 Future Consideration

Label wrap text

Text area labels should behave like paragraphs (They should wrap text, similar to MS Excel).
Ashley Edmonds over 1 year ago in SYNCHRO Control / Forms 1 Planned

matrix of assigned users to forms in a project or group of projects

When onboarding and specifically when removing people from forms it would be useful to have the ability to export/download a matrix of users vs assigned to forms. That would help maintain visibility over which forms the user has a role in.
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

We want to be able to run a report which could create an "Audit Trail" by User ID.

In SYNCHRO control would like to have an option to run a report which would create an "Audit Trail" by user ID or task. Almost like a key stroke report. There are times when our users are working on multiple functions in SYNCHRO and at the same po...
David Dudek Jr. almost 2 years ago in SYNCHRO Control / Admin 0 Future consideration

"Categories"needs to be an advanced search and data visualization option

There is no way to save a search based on Categories (or level names). Categories (level names in dgns) have significant meaning in the models. Being able to search for a group of categories that have a descriptive word (rebar, top, abut, etc) is ...
Guest over 1 year ago in SYNCHRO Control / Models 0

provide upload of editable bindings in flow state definition

When we create Form we can now download the form definition. From there it is very easy to create an excel file with the Editable bindings per status. Having option to upload this into the state definition will speed up the development and tweakin...
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 1 Future consideration

Bi-Directional Selection of 3D Element and Model Tree

When an element is selected in 3D the model tree should jump to the element
Mike Ranney over 3 years ago in [Archive] SYNCHRO 4D Review 0

Infrastructure Cloud - Help Link only Show ProjectWise Link

When we use Infrastructure Cloud Link, and open SYNHCRO project, the Short Cut Link in top Right (just before Profile) still show ProjectWise link. I think need to change to SYNCHRO if we are opening SYNCHRO Project.
Indrawan Wijaya 6 months ago in SYNCHRO Control / Admin 0

To apply to the 3D Window of Synchro Control \ Schedule the same 3D Filters than the one(s) activated at the time of the upload of the .sp file.

As an example, User would like to filter all 3D Objects not assigned to a Schedule Task (through corresponding Material Resources) prior to share the .sp file with stakeholders of the project through Synchro Control \ Schedule, so that unmapped 3D...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 0 Future consideration