Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher
almost 2 years ago
in SYNCHRO Modeler
0
Future consideration
It can be hard to select lines, items or layers in congested areas of the model. Especially when you have big ol construction fingers. It would be very helpful if the Cross-section selection tool was available on all views for easier model selecti...
Thomas Schimpf
almost 2 years ago
in Field / Models | Tools
0
Future Consideration
Able to do Concatenate Some Bindings to a Target Binding
User want to have the function that able to Combine value from some different binding to another single Target Binding. Example to Combine generate single Document Number from different field.
Indrawan Wijaya
almost 2 years ago
in SYNCHRO Control / Forms
0
Future consideration
Add Contingency Transfer (CT) to contract (similar to Change Order)
CT is a line item in the SOV that is already funded and is used to cover the cost for unforseen conditions. This is not added to the contract or SOV as it is already a line item but the CT would document the use of these funds.
Reduce Bindings in Form designer to system and form specific ones only
When creating forms or workflows, the system shows all bindings per form type. It is unnecessary clutter and hard to navigate to the ones actually specified for the form in question. This leads to longer times developing forms and increased testig...
Synchronization of tasks from .sp files schedules by Task ID without use of GUID.
In the settings menu there is an option for Primavera P6 to use activity IDs for synchronization. The same option for Synchro .sp files (and other formats) would be very useful as synchronization from external data goes through GUIDs by default. B...