Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1308

[07] Progressing Task

Need to able give progress on task level in the Field App.
Guest almost 4 years ago in Field / Status update | Tasks 0 Planned

Synchronization of tasks from .sp files schedules by Task ID without use of GUID.

In the settings menu there is an option for Primavera P6 to use activity IDs for synchronization. The same option for Synchro .sp files (and other formats) would be very useful as synchronization from external data goes through GUIDs by default. B...
Varvara Kleshchevnikova over 3 years ago in SYNCHRO 4D Pro / Integrations 0 Future consideration

In resource Usage Matrix freeze column up to rate code

Hi currently the resource usage matrix has column frozen until Row Total, can the columns freeze be until Rate Code
Nageshwar Sesetti over 2 years ago in Perform / Timesheets 0 Future Consideration

Read clash sets from json/csv

Having the ability to export the clash sets to a file (json or csv) and import it would be extremely useful in projects that use the same workspace and tend to have the same categories. Usually, the sets are populated by certain categories. The fi...
Rafael Ramirez Vizuete 6 months ago in SYNCHRO Control / Clash Detection 0

Adding Tag

When adding tag, we do not seems to have a list of existing tags. Request is to list all the existing tags as we enter a string. Also be able to have a hierarchy tag If we could introduce TAG IA so by doing OCR, tags could be propose and accept by...
Luc Poulin 6 months ago in SYNCHRO Control / Documents 0

Control access to sheet under plan set

It does not seem we can control access to sheet in a plan set. Under Documents we can set folder access Under Connections access is control by PWDI We would require the same access control for sheet under plan set.
Luc Poulin 6 months ago in SYNCHRO Control / Plan Sets 0

Locate on Map

For vertical building and large building ( stadium) we will require to have a multi layer map ( one per floor or elevation). Also we need to create a custom map that would represent a section of a building at a specific elevation has we the constr...
Luc Poulin 6 months ago in SYNCHRO Control / Plan Sets 0

Audience for comment

From the pdf Settings, we can add a comment to a pDF How ever we cannot set the audience for the comment it will be visible to all users. Same if we annotate a PDF from the markup. Request is to allow comment creator to set the audience for a comm...
Luc Poulin 6 months ago in SYNCHRO Control / PDF Markup 0

Able to do Concatenate Some Bindings to a Target Binding

User want to have the function that able to Combine value from some different binding to another single Target Binding. Example to Combine generate single Document Number from different field.
Indrawan Wijaya almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

I want to be able to "attach" issues from the entire project to a plan set mark up, not just be limited it to the issues on the drawing.

No description provided
Beth Buerger 12 months ago in SYNCHRO Control / Plan Sets 1