When selecting multiple elements in the model add their quantities together
When selecting multiple elements in the model add there quantities together rather than returning "Varies" If I select two runs of curb and gutter the first being 150ft long and the second being 198ft long I want to get 348ft of curb and gutter in...
Ability to view and add station offset information while creating Forms in field
Similar to how this app does it - https://www.onstationapp.com/ While in the iModel view, we should be able to - Jump to our GPS location, Start a Form Click on the pin to pop up the station information Copy that into a Form - auto or manual
Arpit Prakash
7 months ago
in Field
0
Future Consideration
Bentley includes a "Limit to fields on the form" function in the Actions-Scripts function at the Design Form stage (whoever added this is a genius!). Please include the same "Limit to fields/bindings on the form" function on the Field Options part...
For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
We want to be able to run a report which could create an "Audit Trail" by User ID.
In SYNCHRO control would like to have an option to run a report which would create an "Audit Trail" by user ID or task. Almost like a key stroke report. There are times when our users are working on multiple functions in SYNCHRO and at the same po...
David Dudek Jr.
over 2 years ago
in SYNCHRO Control / Admin
0
Future consideration
provide upload of editable bindings in flow state definition
When we create Form we can now download the form definition. From there it is very easy to create an excel file with the Editable bindings per status. Having option to upload this into the state definition will speed up the development and tweakin...
We have very Detailed activity names, and even after Reducing the Task Indent Space reading activity name is still difficult. If we expand the Activity name column then the Activity Start and Finish date will disappear behind the Gantt. Wrap text ...
When using Synchro for a large building construction, we would like to have the possibility to along with the geolocation (X,Y) add the height to represent the different floor of the building. This will be important as some PDF will share the same...
Add option to transfer comments and photos from one activity to another.
Often photos and comments are uploaded to the wrong activity number. This results in a lengthy process to download the photos and re-enter the comments to the correct activity. Additionally, the person reviewing the entries is often not the same p...
Jackson Morley
almost 3 years ago
in Perform / Site Records
0
Future Consideration