Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1322

We want to be able to run a report which could create an "Audit Trail" by User ID.

In SYNCHRO control would like to have an option to run a report which would create an "Audit Trail" by user ID or task. Almost like a key stroke report. There are times when our users are working on multiple functions in SYNCHRO and at the same po...
David Dudek Jr. over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

The method to define separator used in automatching rule must be refined

When a separator is defined anything that is written in the separator option is considered a separator. This becomes an issue when the client uses one of the separators while defining element code or task code. The rule doesn't work properly. Exam...
Jerry David Jaypaul about 1 year ago in SYNCHRO 4D Pro 2

refreshing browser does not land at where I was in browser. Retain view after refresh

When looking at a schedule of instances of a list of forms (more than 1000 instances) to get to a specific range of instances I have to click multiple times on the paginated list at the bottom of the register. Once there if I press F5 or refresh t...
Kiril Tasev about 1 year ago in SYNCHRO Control 0 Future consideration

provide upload of editable bindings in flow state definition

When we create Form we can now download the form definition. From there it is very easy to create an excel file with the Editable bindings per status. Having option to upload this into the state definition will speed up the development and tweakin...
Kiril Tasev over 2 years ago in SYNCHRO Control / Forms 1 Future consideration

Can progress be performed without 3D

For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
Derryl Acosta about 4 years ago in Field / Status update | Tasks 1 Planned

Ability to re-assign/copy forms

This is possible in Control, but not in Field.
Arpit Prakash about 1 year ago in Field / Forms | Forms / Forms | Inspections 0 Future Consideration

Filter tasks using Activity Codes

Filter Schedule by Activity Code
Joe Griffiths 7 months ago in SYNCHRO Control / Schedule 1

Add multiple work areas at once

Besides the title, it would be great if one could also use 2D hatches to create work areas ( for example from AutoCAD)
Patryk Makowski about 1 year ago in SYNCHRO Modeler 0 Needs review

Add option to transfer comments and photos from one activity to another.

Often photos and comments are uploaded to the wrong activity number. This results in a lengthy process to download the photos and re-enter the comments to the correct activity. Additionally, the person reviewing the entries is often not the same p...
Jackson Morley almost 3 years ago in Perform / Site Records 0 Future Consideration

Ability to use Baseline Dates for EVA Graph and Resource Utilization Graph

Hi everyone, Our 4D Animations from Synchro 4D Pro are created as Baseline Dates vs Actual Dates. There is an option to set the dates for 3D Windows in the 3D View Properties Tab, but the same option is not avaiable for EVA Graph and Resource Util...
Sourav Kumar 7 months ago in SYNCHRO 4D Pro / Animations 0