We want to be able to run a report which could create an "Audit Trail" by User ID.
In SYNCHRO control would like to have an option to run a report which would create an "Audit Trail" by user ID or task. Almost like a key stroke report. There are times when our users are working on multiple functions in SYNCHRO and at the same po...
David Dudek Jr.
over 2 years ago
in SYNCHRO Control / Admin
0
Future consideration
The method to define separator used in automatching rule must be refined
When a separator is defined anything that is written in the separator option is considered a separator. This becomes an issue when the client uses one of the separators while defining element code or task code. The rule doesn't work properly. Exam...
Jerry David Jaypaul
about 1 year ago
in SYNCHRO 4D Pro
2
refreshing browser does not land at where I was in browser. Retain view after refresh
When looking at a schedule of instances of a list of forms (more than 1000 instances) to get to a specific range of instances I have to click multiple times on the paginated list at the bottom of the register. Once there if I press F5 or refresh t...
Kiril Tasev
about 1 year ago
in SYNCHRO Control
0
Future consideration
provide upload of editable bindings in flow state definition
When we create Form we can now download the form definition. From there it is very easy to create an excel file with the Editable bindings per status. Having option to upload this into the state definition will speed up the development and tweakin...
For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
Add option to transfer comments and photos from one activity to another.
Often photos and comments are uploaded to the wrong activity number. This results in a lengthy process to download the photos and re-enter the comments to the correct activity. Additionally, the person reviewing the entries is often not the same p...
Jackson Morley
almost 3 years ago
in Perform / Site Records
0
Future Consideration
Ability to use Baseline Dates for EVA Graph and Resource Utilization Graph
Hi everyone, Our 4D Animations from Synchro 4D Pro are created as Baseline Dates vs Actual Dates. There is an option to set the dates for 3D Windows in the 3D View Properties Tab, but the same option is not avaiable for EVA Graph and Resource Util...