Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

SYNCHRO Control

Showing 758

Unpublish or delete in batch

If we wanted to unpublish or delete in batch multiple documents under PDF Settings We do not seems to have this option. Also if we delete a sheet which is at the top of a version pile, only this sheet is delete, we have to redo the same process fo...
Luc Poulin about 1 year ago in SYNCHRO Control / Admin 0

Workpackage/plant set

The idea is to push the concept of work package further for vertical infrastructure and large building Instead of being a form, have a complete environment dedicated to Work Package so we can deliver rich work instructions to the field The new env...
Luc Poulin about 1 year ago in SYNCHRO Control / Plan Sets 0

scan multiple documents using synchro

I like the way Dropbox functions and allows several documents to be scanned or uploaded at one time. I do see value in having a function like that through synchro
Misti Daigle about 1 year ago in SYNCHRO Control / Forms 0

Being able to add KMZ file to a individual form

Being able to add KMZ file to a individual form
Misti Daigle about 1 year ago in SYNCHRO Control / Forms 0

Rotate markup image in PDF markups after placement

Need to Rotate the image after insert. Scale and rotate after insert image in PDF markup.
Dan Sheldon over 4 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Ability to see both Profile/Cross Section View together

Arpit Prakash over 4 years ago in SYNCHRO Control / Models 1 Future consideration

Add Contingency Transfer (CT) to contract (similar to Change Order)

CT is a line item in the SOV that is already funded and is used to cover the cost for unforseen conditions. This is not added to the contract or SOV as it is already a line item but the CT would document the use of these funds.
Scott Musheff about 1 year ago in SYNCHRO Control / Admin 0

Ability to pull iModel/PDF properties to a Binding

This will help extract some core properties from the iModel, to populate planned quantities, locations, physical attributes, pay item, etc.
Arpit Prakash about 2 years ago in SYNCHRO Control / Forms 0

Allow different SYNCHRO Forms permissions to be set at various workflow states

Currently, we can assign each user role a set of permissions (e.g. View, Create and Edit, Assign). With role-based access control, for each user, we can restrict access to workflow state changes of forms and form visibility. However, this is still...
Guest over 4 years ago in SYNCHRO Control / Forms 2 Future consideration

Automatically add Map location when adding a geolocated Model location on a Form

Arpit Prakash about 2 years ago in SYNCHRO Control / Forms 0 Future consideration