Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1303

the Auto - Sent By column (same like Created By Column)

For the Form it is good to have the Sent By Column, to identify who is the previous user.
Indrawan Wijaya over 1 year ago in SYNCHRO Control / Forms 2 Will not implement

I would like the ability to add additional fields into the Field App View for Forms

I would like the ability to add additional fields into the Field App View for Forms. This option will allow us to be able to sort on a specific field in the field App.
David Dudek over 1 year ago in SYNCHRO Control / Field/Mobile 0

Implementation of a "split screen" feature within the Field app

have a "split screen" capability to see PDF document while keeping the view of the model, similar to what iPad can do.
Tony Bonacorsi over 1 year ago in Field / Models | Visibility 1 Future Consideration

I want to be able to "attach" issues from the entire project to a plan set mark up, not just be limited it to the issues on the drawing.

No description provided
Beth Buerger 10 months ago in SYNCHRO Control / Plan Sets 1

Ability to change status of more than one form at a time

Having to manually turn each form from published to draft just takes too long
Guest over 3 years ago in SYNCHRO Control / Forms 2 Future consideration

Data Visualization multiple search capabilites

Would like to have the ability to use advanced search parameters and multiple queries of model properties to refine data visualization searches.
Kerry Newbanks over 1 year ago in SYNCHRO Control / Civil Tools 1

Add legend of ActivityCode Values in Gantt while in 'Activity Code Color' Mode

We're using the activity code color model to define tasks for multiple companies. But it's not possible to add a legend to the Gantt to define the colors.Legend must be suitable to show both ACV and/or ACV Description
Bram Wildekamp over 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1

Saved layouts for Usage Matrix

Ability to create, save and share layouts of the Usage Matrix
Luke Read over 1 year ago in Perform / Timesheets 0 Future Consideration

Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.

Currently in synchro Control \ Schedule the animation is starting at the Project Start Date. Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas about 3 years ago in SYNCHRO Control 1 Future consideration

add createdDateTime column to forms schedule view as standard

When uploading data through csv and in other cases it is extremely needed to be able to see the timestamp of when a form instance was created and to compare to other instances. Currently the only way is to open the form instance and check the audi...
Kiril Tasev 5 months ago in SYNCHRO Control / Forms 0