How to determine which element of the model the task is assigned to?
By clicking on a task in the diagram, we see only the assignments of the task, but we do not understand which elements it is assigned to. Perhaps you should add the function of displaying only the elements assigned to the selected tasks (isolation...
Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.
Currently in synchro Control \ Schedule the animation is starting at the Project Start Date.
Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control
1
Future consideration
Could capabilities be added for using a 3d Connexion Spacemouse? Currently, I can only zoom in and out - no rotation. It seems this would only require communication with their software development department.
Add cost codes within modeler tree and have capability to export cost code configuration.
The default format of setting up a cost code configuration to attach to a model is too rigid. It is almost impossible to determine which codes will need to be incorporated for a design build project model. As designers update models more codes wil...
David Gallaher
over 1 year ago
in SYNCHRO Modeler
0
Future consideration
Ability to filter/select PDF settings plan sheets by user defined tags.
In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...
Exported 4D synchro .fbx format when linked with 3ds max file texturing is not possible
Our Team is working on one project and our scope is to export 3D model from synchro as .fbx file and link that file into 3ds max to create rendering according to the planned dates from schedule because we need to update that file multiple times as...
It would be great if we can have the search function for documents within SYNCHRO Field. We have a client who is about to upload approx. 100 pdfs per day in Control-documents, pdfs which will be opened by inspectors on site. Imagine someone on sit...