PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1303

PDF geolocation by level for building

When using Synchro for a large building construction, we would like to have the possibility to along with the geolocation (X,Y) add the height to represent the different floor of the building. This will be important as some PDF will share the same...
Luc Poulin 9 months ago in SYNCHRO Control / Plan Sets 0

Ability to change Status of all Related Forms in bulk

Eg, if there was an observation created, which was escalated to an Issue, which became part of a Change Order (in SYNCHRO Cost), and once the change order is accepted/ closed, the user should get the option to apply a similar status of all the rel...
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Synchro Modeler idea: Generating surfaces from Work Areas in Synchro Modeler

Hi Synchro team, We are running a pilot on a road and bridge project with Synchro 4D Pro including Control, Modeler and Synchro 4D Pro. The designers are currently working on both the road and civil design. We would like to start scheduling and si...
Stephan Klotz over 3 years ago in SYNCHRO Modeler 0 Needs review

Change Assigned to font

Can the color scheme, background or font be changed in the synchro field app when users try to submit a form for review. When they submit a form for review it prompts them to assign a recipient for review, but the default image appears to be greye...
Arpit Prakash 10 months ago in Field / Forms | Forms 0 Planned

Add new sort/filter feature for Dockets (sort/filter by cost code)

This feature will be very useful as our project is set-up via cost-codes. So sorting/filtering via cost-code will be very important
Rocky Ursino 5 months ago in Perform / Dockets 0

We want the option to be able to delete FORMS on our own that have been published and filled out.

On the Forms we create for our organization we should have more control of what we can do with our Forms. We would like to be able to delete obsolete forms or move into "Recycle Bin".
David Dudek Jr. almost 3 years ago in SYNCHRO Control / Forms 1 Future consideration

Creating a new Form using Design template does not copy over pdf mapping/workflow


Arpit Prakash 10 months ago in SYNCHRO Control / Forms 0

Data Visualization in Modeler

Incorporate the same data visualization feature in SYNCHRO Control in Modeler. This should be enabled for default and QTO views. It allows users to customize the colors of elements to assist in determining property data is correctly being transfer...
David Gallaher over 1 year ago in SYNCHRO Modeler 0 Planned

Aggregated dashboard to show work items (forms) for all projects

Proof of concept has been completed by atkins team members. having this dashboard function embedded within controls would be of significant value to senior stakeholders across the project
Leon Simmons about 1 year ago in SYNCHRO Control / Reports 0 Future consideration

Able to progressing for Resource Group to Task

Right now, Field only can do progressing if the Resource directly link to Task, progressing is not working if we link resource group to task. In Pro, sometime we need to link resource group to task for better grow simulation. Need to improve Field...
Indrawan Wijaya over 3 years ago in Field / Status update | Resources 1 Planned