Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 473 of 473

Enable Direct Assignment When Reopening Forms

When reopening the form could be possible to assign that reopening directly. 
Yessica Andrade Barbosa over 1 year ago in SYNCHRO Control / Forms 0

Add a Pin on a Form

There Should be a possibility to set a Control with a pin. That means when you choose it you should be able to set a Pin to save this Control Value. E.G: when you collect defects on the same level you don't need to fill the Level every time for ea...
Alexander Koenig over 1 year ago in SYNCHRO Control / Forms 0

Infrastructure Cloud - Help Link only Show ProjectWise Link

When we use Infrastructure Cloud Link, and open SYNHCRO project, the Short Cut Link in top Right (just before Profile) still show ProjectWise link. I think need to change to SYNCHRO if we are opening SYNCHRO Project.
Indrawan Wijaya over 1 year ago in SYNCHRO Control / Admin 0

Ability to map the date tied with a Signature control seperately to a fillable pdf

Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Able to Set Form Status for Multi Form Selected (SYNCHRO Form Manager)

Can set Form Status for Multi form Selected (in Form Manager) Current we must set the Form Status one bye one. Example: Set All Form Design to Draft. or Publish multi form in one click. Thank you.
Indrawan Wijaya over 2 years ago in SYNCHRO Control / Forms 1 Planned

Add current progress % next to progress bar for each activity in "All Activities" page

This is an idea from our programming team, which they find it very useful if can directly know the progress of each activity, with the aid of filtering function and WBS, instead of going to another page like "Quantity Progress", which doesn't have...
Tat Man Leung over 1 year ago in SYNCHRO Perform / Program/Schedule Collaboration 0 Future Consideration

Multiple 3D window option for comparing planned versus actual progress

Being able to compare the baseline or planned schedule versus the actual schedule by having the possibility to open more 3D windows.
Brigt Rykkje over 5 years ago in [Archive] SYNCHRO 4D Review 0 Planned

Add Legend to Synchro Control Schedule-enabled saved views

Add a legend similar to 4D Pro that shows the appearance profiles in schedule-enabled iModel saved views.
Sarah Ruckhaus over 1 year ago in SYNCHRO Control 0

Allow save of a form with incomplete data in mandatory fields in a status

When form bindings are set as required in "status" window the published form will not allow intermediate save until ALL properties have values. Allow for incomplete data to be saved by user. From user perspective I have contributed time to populat...
Kiril Tasev over 1 year ago in SYNCHRO Control 0

Field App - Ability to scroll through a PDF Plan Set

When I have a PDF Plan Set uploaded to Control, I am able to scroll through all the Sheets. When I login to the Field App, I do not have his ability. I have to go to each PDF Sheet to view without the ability to scroll. I need to back out of the c...
Derryl Acosta about 4 years ago in SYNCHRO Field 0 Planned