Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1308

Additional Features Synchro Control - Power Bi plug in

Hey, I was testing out the Synchro Control - Power Bi plug in and ran into a little issue. Not all the information I wanted was getting exported and some data I wasn't interested in was. Is it possible to add in a feature so we can determine which...
alex van belleghem over 2 years ago in SYNCHRO Control / APIs 0

Data Visualization in Modeler

Incorporate the same data visualization feature in SYNCHRO Control in Modeler. This should be enabled for default and QTO views. It allows users to customize the colors of elements to assist in determining property data is correctly being transfer...
David Gallaher over 1 year ago in SYNCHRO Modeler 0 Planned

Mapped Master Dataset for forms

Would like to see a Master dataset hosted via Excel spreadsheet (or similar) that contains all Master data for a Control project and specifically the information commonly referenced via dropdown lists and pick lists on custom forms. Suggested that...
Matthew Blake over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Primavera P6 v21 compatibility with Bentley Synchro 4D

I am trying to synchronize my Primavera P6 schedule using Synchro 4D Pro, but I am facing an issue. I am using Primavera P6 version 21, which is not supported by Synchro 4D Pro. Synchro 4D Pro only supports Primavera P6 versions 19.2 or lower. I'v...
Ankit Rai 11 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Will not implement

How to determine which element of the model the task is assigned to?

By clicking on a task in the diagram, we see only the assignments of the task, but we do not understand which elements it is assigned to. Perhaps you should add the function of displaying only the elements assigned to the selected tasks (isolation...
Guest almost 4 years ago in SYNCHRO Modeler 0 Planned

Display Photo Count within Media Indexing

Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
Guest over 3 years ago in SYNCHRO Control / Media Indexing 0 Future consideration

Add media indexing and schedule on field app.

Photos will be taking in the field using the app however there is now way to view all photos because there is no media indexing tab. This goes the same for schedule.
David Gallaher almost 2 years ago in Field / Forms | Media 2 Future Consideration

Ability to users to create a form hierachy with a filter/search function.

Currently all forms are listed alphabetically. SYNCHRO Control projects could have hundreds of forms created. I want the ability to group them by categories that we develop which can later be used to drill down through along with a filtering and s...
David Gallaher almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Easier Location of equipment using synchro field

In a big site where you have thousands of supports, piping and cabinets in various floors, It is practically difficult locating installed equipment on site. as the equipment are only liked via schedule, because everything is greyed out, you don't ...
Gareth Odiakose 5 months ago in Field / Status update | Tasks 0

Navisworks Exporter - Limit User Fields like the Revit Exporter

The .spx exporter in Revit has the ability to limit the number of Userfields exported from Revit. I think it would be a great idea to have the same function built into the Navisworks Exporter. Currently, it exports all Userfields and values and th...
Preston Williams 11 months ago in SYNCHRO 4D Pro / Microstation/Revit/Navisworks Plugins 0