Ability to flag daily or weekly Templated Report(s) as "Favourites"
If you have a long list of Templated Reports on a project, with not all of them being applicable to a user, it would be good for a user to flag their "Favourite" reports and have them appear at the top of the list
Stamp a PDF with a custom stamp via a Web Services API call
(MUST) As a Bentley developer I want to be able to stamp a PDF file with an image/text via a Web Service API call using PDFTron (Apryse). (MUST) As a Bentley developer I want to be able to specify the location of the stamp to allow for positioning...
When creating a project using the ITwin API that project is not visible in SYNCHRO Control. Project creation through the Projects API was a request they made when the Projects API was being migrated into the iTwin API and never responded too.
Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
It would be helpful to have the option of Deleting Multiple Attachments from a Form filled out rather than one at a time. There are times we have a lot of attachments on a form we escalated and need to delete all the attached documents from the form.
David Dudek Jr.
almost 3 years ago
in SYNCHRO Control
0
Planned
Connection between the form document number and Synchro ID column
Having the form document number and Synchro ID column the same is beneficial to each project member as they do not need to open each file to
check on what they are looking for. They can straightaway see it from the ID column listed. During form c...
Kimberly Nazareth Angeles
almost 3 years ago
in SYNCHRO Control / Forms
0
Future consideration