Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 493

3D Filters for assigned geometry

The users have lots 3D Objects that unassigned to the tasks. It would be useful if we can have a feature (like 3d filter) that will allow us to display only assigned geometry to the tasks I was trying to use Data Visualization tool, but I found it...
Guest almost 2 years ago in SYNCHRO Control / Models 0 Future consideration

iModel on queued

When there is change on iModel, we always see that the iModel have this status " "Synchronozation queued". But we never know how long is the queue? Can we have button to make the Sync start? Why need to be on queue? as user, we need information......
Indrawan Wijaya over 3 years ago in SYNCHRO Control / Models 0 Future consideration

allow multiuassign to have custom binder

There are cases which will benefit greatly from having the ability to assign custom bindings to the Multiassign control. E.g. Subcontractors supervisors live on a project. The selection does not need to assign the form to the custom users, just be...
Kiril Tasev 11 months ago in SYNCHRO Control / Forms 0 Future consideration

Swap "Create" and "iModels"

swap the position of the two windows marked in red in the attachment.
Shaohua Guan almost 2 years ago in SYNCHRO Control / Admin 0 Future consideration

A New Task Filter Allowing You To Filter Based On Assigned Resources

We require this feature because we need a quick way of filtering tasks without/with any resources assigned after doing a programme synchronisation. Currently the only way to do this is by filtering the resources manually, however, when you import ...
Daniel Clayson almost 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

To have performance percentage complete in Synchro

By default the performance percentage complete is built-in in P6, having performance percentage complete in synchro can directly display the percentage of earned value cost / budgeted total cost in a project.
Andy Fong almost 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

search bar on selecting org template

It will be better to have search bar to search project while selecting Org Template
Manoj Jamma almost 3 years ago in SYNCHRO Control / Admin 0 Future consideration

multiple transitions to same closed state with different outcome of inspection

Case scenario: Transition from State A(open) to Closed by Client inspector named "Passed" based on Approve credentials Transition from State A(open) to Closed by Subcontractor named "Non attendance" based on Create credentials
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Flow BreakSwitch - contact authorised role or admin to move flow when blocked by someone or something

Provide option to notify authorised role or admin that a flow is blocked by person or rule and needs intervention or progression. Case scenario: Flow goes from subcontractor to Client for Inspection. If Client decides they may not carry the Inspec...
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

To stop the imodel synchronising process

Possible to allow users to stop the synchronising process? Currently, users not able to stop the process once it is started, and not able to skip to the next model that is in the queue. Is there a way to skip the synchronizing process to the next ...
Guest almost 4 years ago in SYNCHRO 4D Pro 2 Future consideration