PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 493

Group vs Individual Saved View share setting behaviour

If a Group has multiple Saved Views within it, and we turn on Sharing, all the views become shared. However, if another non-shared View is added to a Shared Group, that and any other subsequent Views need to be individually shared manually. At th...
Arpit Prakash almost 4 years ago in [Archive] SYNCHRO 4D Review 0 Future consideration

Importing from Revit with metric reverts unit to feet unless settings are adjusted in 3D Import dialog

There is one bug I have found, it’s an easy fix but took a while to figure out: When importing spx files from revit using the import project, it will assume the default unit as feet even though revit and synchro are both setup in metric. The way t...
Guest about 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Ability to have subproject

We need the ability to have multiple projects under one main project. I this example, see attached image. I have one main job number. And in this case 350 different airports or sub projects. Each project has the same folder structure in it. Right ...
Martin Price about 3 years ago in SYNCHRO Control / Admin 0 Future consideration

Grid control options

Grid control / Table functions needs improving, needs to function more like MS office. This tool is very difficult to use and can be very inconvenient. The grid control should also allow for limited horizontal inputs, allowing X and Y data as apos...
Ashley Edmonds over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Export forms summary or grid view of forms with photos to single pdf

user should be able to export forms summary or grid view of forms with photos to single pdf
Manoj Jamma almost 4 years ago in SYNCHRO Control / Reports 0 Future consideration

Be able to add GeoTIFF or place images as textured plane on coordinates

Being able to do this would improve the current workflow (manual placement of textured plane on a 2D raster that is imported as 3D) Improvement in Quality (exact placement) Improvement in efficiency (no manual placement)
Bram Wildekamp about 3 years ago in SYNCHRO 4D Pro / Import/Export 2 Future consideration

3D View Focus Time Date - Display First Day of Week

This is useful because we would like to be able to show the week commencing date in the 3D view focus time. Currently we set the project focus time to the end of each week (Sunday) in order to capture all the activities happening, however this mea...
Daniel Clayson about 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Include 3D Filters created from Pro in the Control iModel

Currently there is no easy way to access the 3D Filters created in 4D Pro in the Control model viewer. 3D Filters can be used to isolate objects and load models quickly.
Guest almost 4 years ago in [Archive] SYNCHRO 4D Review 1 Future consideration

export multiple escalated forms in one PDF

if form A is escalated to form B, each form need to be exported separately. have the option to export both forms in one PDF document if one form is escalated to another.
Siti Nurhazirah Mokmin almost 4 years ago in SYNCHRO Control / Reports 0 Future consideration

Two point scale and rotate PDF that are not geolocated

Need a way to locate two known objects on the PDF and then the same spots on the map to move and rotate onto the pdf the map.
Dan Sheldon almost 4 years ago in SYNCHRO Control / Plan Sets 1 Future consideration