Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1284

Form PDF exported through Transition creates a folder structure regardless of not containing Attachments

The following settings always create a folder structure containing an empty Attachments folder. When manually exporting from the Grid, it exports just PDF if no Attachments are available -
Arpit Prakash 3 months ago in SYNCHRO Control / Forms 0

Enhancement and Customisability of SYNCHRO Notifications

This idea has two parts to it: 1) Enhancement After using SYNCHRO and deploying it for many projects, we realise the pressing need for the following to be available: Notification once a form is overdue Notification to apply to eveyone in the CC li...
Guest almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Project wide Forms bindings

We need a project-wide binding that can be assigned values at a project level, and be used across multiple Forms definition/Inspections. This will enable users to re-use repetitive information like Project Details.
Arpit Prakash 8 months ago in SYNCHRO Control / Forms 0

Add Contingency Transfer (CT) to contract (similar to Change Order)

CT is a line item in the SOV that is already funded and is used to cover the cost for unforseen conditions. This is not added to the contract or SOV as it is already a line item but the CT would document the use of these funds.
Scott Musheff about 2 months ago in SYNCHRO Control / Admin 0

Simulation with percent complete number base on Focus Time

in Task list in Gantt, ability to show the task plan percent complete simulation base on the Focus Time.
Indrawan Wijaya about 2 months ago in SYNCHRO 4D Pro / Animations 1

Ability to link to a specific sheet within Plan Set or Specifications

No description provided
Arpit Prakash 3 months ago in SYNCHRO Control / Plan Sets 0

Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule

Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro. These layouts must include : - Schedule Tasks Group and Sort, - Schedules tasks filters, - Relevant Schedule Tasks Attrib...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 1 Planned

Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro

In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas about 2 years ago in SYNCHRO Control / Models 0 Future consideration

Private and Public markups

As a Construction Documentation management software, there should be a differentiation between public and private markups. As of now, any project member can markup any document, including plan sets, and those markups would be seen by everybody els...
Rafael Ramirez Vizuete about 1 year ago in SYNCHRO Control / PDF Markup 1 Future consideration

smoother and faster navigation in iModel

users and project team have feedback that SYNCHRO Control iModel navigation is laggy and slow. please look into the matter so that the model can orbit and rotate smoother and faster.
Guest about 3 years ago in SYNCHRO Control / Models 2 Already exists