Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1301

Failed Items - Have a generic list

Suggestion: Have a list of mostly generic / common failed items. (Pick list vs. having to type in the field)
Beth Buerger over 5 years ago in SYNCHRO Control 0

P013093- Web 'Construction Status'

The button “construction status” doesn’t work on the web. It goes to the document overview
Guest almost 6 years ago in SYNCHRO Control 0 Already exists

Remove all unused attribute fields from the Mobile viewing page

The app does not hide unused attribute fields and they feel there is too much "fluff" for in the field. This will not only add development for us, but also be a code change to Field Engineer.We inherited the property functionality from Field Engin...
Beth Buerger almost 6 years ago in SYNCHRO Control 0 Will not implement

Phone execution of an Inspection Form

As a user I want to use my phone to execute an inspection by locating an object near me and picking from a list of choices.
Corey Johnson almost 6 years ago in SYNCHRO Control / Inspection 0

Default date and "in report" for log entries

Can we set the web activity log fields to be default "todays date" and "include in reports"=true. as opposed to currently they are blank.
Philip Wheeler 11 months ago in Perform / Daily Diary & Reports 2 Future Consideration

Need to be able to print forms at any stage,

There should be an option to print form at any stage Cancel / Save-Exit should be "Print / Save-Exit / Cancel"
Keith Anthon almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Assemblies

Hi, In Revit, some elements are modelling as linked assemblies for example walls. There are actually some layers for walls and each layer is a material with its own properties like cost or thickness etc. when they are modelled in Revit. However, w...
Taha Erenoğlu over 2 years ago in SYNCHRO 4D Pro / Integrations 3 Future consideration

3D Notation ( to hold the planned date)

How to add the planned cast date to the notation into the 3D snapshot view ? or is there any way to extract the date in grant chart to the 3D model
chan kp over 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Control Growth speed of appearance profile

Having a Growth speed parameter to the appearance profile. eg- Stepwise, interval wise, Gradual speed
Romit Takle about 3 years ago in SYNCHRO 4D Pro / Animations 0 Future consideration

Drag and Drop tasks to reposition them

Re-organizing multiple tasks by using the outdent, indent, move up and move down is slow and cumbersome. It would be a lot easier of we could simply drag them into their new position as can be done in MS Project.
over 5 years ago in SYNCHRO 4D Pro 0 Already exists