Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1042

Ability to add custom metadata to Projects to help filter and generate insights


Arpit Prakash over 2 years ago in SYNCHRO Control / Admin 1 Future consideration

Reassign Button in SYNCHRO Field

The possibility to reassign a form could be integrated into the SYNCHRO Field and not only limited to SYNCHRO Control.
Joana Isabel Neves Gomes over 1 year ago in Field / Forms | Forms 4 Future Consideration

Related forms to be bound to a specific location or control in a form.

When we relate forms we usually do that for a specific reason or as a workaround to raise a form from within a form. When related currently the forms are showing bunched up together with no sensible order or context. As a user I want to see the es...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0

Actions for Inspections

Previously created Actions/Scripts should not be deleted if the inspection forms are updated via Excel upload. The desired behavior is error messages in Actions if bindings are not found.
Shaohua Guan over 1 year ago in SYNCHRO Control / Inspection 0 Planned

Option to Search and Filter Categories and Model

In the Model viewer, it would be extremely useful to be able to search in the Category and Model trees and turn on/off specific Categories or Models. This functionality exists in Control.
Ariel Froerer over 2 years ago in Field / Models | Visibility 2 Planned

To have the possibility to define a look-ahead filter for the Gantt window accessible from Synchro Control \ Schedule

Currently all Schedule Tasks within the Synchro 4D Pro .sp file are displayed in the Gantt Window accessible from Synchro Control \ Schedule. As we can have several thousands of Activities, it will be difficult for User to understand which are th...
Thibault Dumas almost 4 years ago in SYNCHRO Control / Models 1 Future consideration

Delete Bindings

Want the ability to Delete a Binding(s) that are unused and unassigned on FORM Definitions
Derryl Acosta about 4 years ago in SYNCHRO Control / Forms 2 Planned

Ability to unselect items while registering a project

Arpit Prakash about 1 year ago in SYNCHRO Control / Admin 0 Planned

Display Resources Tree in Synchro Control \ Schedule

To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Thibault Dumas almost 4 years ago in SYNCHRO Control / Models 1 Future consideration

Size of Survey photo in pdf export using custom layout is small

Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0