Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1358

I would like the ability to attach any form type to my PDF mark up for reference purposes.

I would like to attach/associate any form (RFI, issue, observation) etc to my mark-up.
Beth Buerger over 1 year ago in SYNCHRO Control / PDF Markup 1 Planned

Zip the files auto-exported through Forms Workflow Transition

Currently, the files are exported as per the image below. It should zip only if attachments are available, but just export the raw pdf otherwise.
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0

Automate the process of creating a SYNCHRO/BIC project

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control 0

Ability to upload multiple Inspection Configuration spreadsheets

Currently, we need to maintain a singular spreadsheet to add additional Form Definitions to the same project. This spreadsheet can become very large and hard to manage, and would be easier to have distinct spreadsheets for sets of similar Forms.
Arpit Prakash over 1 year ago in SYNCHRO Control / Inspection 0 Unlikely to implement

Issues with moving Regions

It seems the Region sometimes goes to a random location, within another Region if i try to move it around. This mostly happens if I drop it part outside the canvas. Also, doesn't look like i can move a Control below a region, but have to move the ...
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Ability to map Form binding to project meta-data

This is esp. helpful when setting up a template projects and provisioning them to production. Bindings could be map to project metadata like Project Name, No. etc, and be autofilled in all Form definitions.
Arpit Prakash about 1 year ago in SYNCHRO Control 0

Project wide Forms bindings

We need a project-wide binding that can be assigned values at a project level, and be used across multiple Forms definition/Inspections. This will enable users to re-use repetitive information like Project Details.
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Automatically create resource for sliced object in Synchro modeler

Currently, if an element is sliced in Synchro Modeler, its sub-part is not associated with a 3D resource in Synchro 4D, even though the parent element has been associated with a 3D resource. To link these split elements to tasks, we have to manual...
Khai Nam Hoang 3 months ago in SYNCHRO Modeler / Slice 0 Needs review

Ability to download a previously uploaded cost code excel sheet.

if you have a user who originally created a cost code excel spreadsheet upload, and they leave the company, we have no way to download and/or update the cost code structure without a version of the file. Currently you need the original spreadsheet...
Corey Johnson 10 months ago in SYNCHRO Modeler 0 Needs review

Show Legend based on Appearance Profiles in the 3D Window of Synchro Control \ Schedule

Currently no Legend is displayed in the 3D Window accessible from the Schedule functionality of Synchro Control. As a Synchro .sp file can be related to various subjects: Engineering Steps, Procurement Cycle, Construction Sequences,... As Legends ...
Thibault Dumas over 3 years ago in SYNCHRO Control 2 Future consideration