Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1342

separate 3D view selected objects

We often use the 3D subdive window not to cut objects, but to see which objects are selected. You can also use filters for this, but if you want to see the linked objects (task with assignments) for each task, setting filters is too much work ever...
Martijn Querner 6 months ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Ability to autofill cascading dropdown list if only one option is avaible.

This would be a similar behaviour to Forms in BIC.
Arpit Prakash 3 months ago in Field 0

Automate the process of creating a SYNCHRO/BIC project

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control 0

Ability to upload multiple Inspection Configuration spreadsheets

Currently, we need to maintain a singular spreadsheet to add additional Form Definitions to the same project. This spreadsheet can become very large and hard to manage, and would be easier to have distinct spreadsheets for sets of similar Forms.
Arpit Prakash over 1 year ago in SYNCHRO Control / Inspection 0 Unlikely to implement

Issues with moving Regions

It seems the Region sometimes goes to a random location, within another Region if i try to move it around. This mostly happens if I drop it part outside the canvas. Also, doesn't look like i can move a Control below a region, but have to move the ...
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Provide "Project Owner" column in project list

Provide "Project Owner" column in project list. This will allow better visibility, management and filtering of Projects.
Kiril Tasev 6 months ago in SYNCHRO Control 0

Project wide Forms bindings

We need a project-wide binding that can be assigned values at a project level, and be used across multiple Forms definition/Inspections. This will enable users to re-use repetitive information like Project Details.
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Zip the files auto-exported through Forms Workflow Transition

Currently, the files are exported as per the image below. It should zip only if attachments are available, but just export the raw pdf otherwise.
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0

Email notifications showing mis-leading information

Ability to change the basic email notification sent out. Currently the email notification includes info like Created by and Created on, which COUNTERINTUITIVELY tells the user who has DESIGNED this form and WHEN IT WAS DESINGED.. instead of showin...
Irena Seleznjova 10 months ago in SYNCHRO Control / Forms 0

Attachments within Transition Button

It would be usefull to have a way to also include attachments, as we do through the normal PDF export (in a folder for attachments), using the transition button in the workflow
Joana Isabel Neves Gomes 10 months ago in SYNCHRO Control / Forms 0 Future consideration