Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 493

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers almost 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.

For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas almost 3 years ago in SYNCHRO Control 1 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 1 Future consideration

growth simulation to follow 3D path (or polyline)

eg. centerline of pipe, building facade, or curved road
Kate Hester over 7 years ago in SYNCHRO 4D Pro 0 Future consideration

Expand workflows to support automated assignment to previous users

We find the need to expand the built in user controls like Previous action/status user that will allow simple automation to return the flow to the originator in multistep flows.
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to save Civil Tools Views

Users want to be able to save profile/cross-section views, with any visible measured dimensions. We should be able to save it to local drive/documents/included in saved views. The use case is to share the information and also attach to Forms. Curr...
Arpit Prakash over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Create a Form within a Form

Forms Manager being able to create a Form within a Form. For example; offering the functionality to directly create a punchlist from an Inspection if there's a deviation / breakage / nonconformance; the user can create a Punchlist without having t...
Guest over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

PDF Plan set setting Bulk Edit

When editing the the PDF plan set it would be beneficial to bulk edit items such as Discipline Dates, Type to make initial publishing and QC corrections more efficient
Bill McNamara over 4 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Support for 3D Connexion mouse

No description provided
Guest almost 5 years ago in SYNCHRO 4D Pro / Integrations / SYNCHRO Open Viewer 3 Future consideration

Rollback UX improvements

Include roll back option as separate permissions in the roles. In large projects you don't want roll back to be available to everyone. Now we can't see what changes were made by who and what the impact is on the work that is done. There is also no...
Martijn Querner almost 2 years ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration