Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1342 of 1342

Widget: Attendance - Sort by options

Please add to the attendance widget an option to sorted by assigned supervisor , creator, updater or company. This will help to organise the attendance for the users of the report.
Jason EDWARDS almost 3 years ago in EVM (Perform) / Reports 1 Future Consideration

Widget: Attendance - Timezone modifier toggle

Please adjust the timezone modifier to be able to toggle on and off. For projects that only report to the same country this additional information does not add value and clutters the report.
Jason EDWARDS almost 3 years ago in EVM (Perform) / Reports 0 Future Consideration

Copy/paste tasks between open SP files

currently you can use copy as text/paste as text to copy tasks between 2 separate SP files improvement is to allow users to Copy Task/Paste Task (and all of it's properties) between 2 open SP files
almost 6 years ago in SYNCHRO 4D Pro 0 Already exists

Selecting/Filtering Element Based on MetaData/User Field Search during Status Update in SYNCHRO Field.

Sometimes, it becomes very tedious to select the right 3D resource manually during Status Update. For example, selecting a pile based on 'Pile Number' user field would be a lot easier than just manually selecting the 3D object on the screen among ...
Anik Mal almost 3 years ago in Field / Status update | Resources 1 Future Consideration

There should be an option to sort the selected rows on Bulk Assign page.

Refer attached image. There may be a case where user selects multiple rows on multiple pages for assignment, But before assignment want to review what rows are selected. Currently there is no way other than going thro each page and check. It would...
Pankaj Lalsare about 3 years ago in EVM (Perform) / Program/Schedule Collaboration 0 Future Consideration

summary on the Inspection Hierarchy (How many Closed / Available = % completed)

No description provided
Indrawan Gmail about 3 years ago in SYNCHRO Control / Inspection 0 Future consideration

Security Function Setting per Inspection Type

To have the Security Function Setting per Inspection Type like Normal Form. Right now we only have one security setting for all Inspection Type. Please see snapshot.
Indrawan Gmail about 3 years ago in SYNCHRO Control / Inspection 0 Future consideration

take measurements and calculate areas while performing an inspecting

as an inspector I use a Wheel measurement device to measure distances and calculate area. I want to be able to use an enhanced GPS device to record these points and display on a map. I should be able to measure along a line (2Pts) measure multiple...
Bill McNamara about 6 years ago in SYNCHRO Control / Maps 0 Future consideration

Search Form Type Function

When user have more than 20 Forms Type, it is good if there is search function that can Filter the Form type. Please see attachment.
Indrawan Gmail about 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Add deselect option in resource assignment dialog when objects are already assigned to another resource

Often, you will forget to deselect a 3D object before selecting other objects to assign to a resource. In this case, at the end of the resource assignment wizard there is an option to either unassign the objects already in a resource, or cancel. I...
about 6 years ago in SYNCHRO 4D Pro 0 Future consideration